|
Progress report on the project VIII/2013 Quality Assessment HM and geotechnical exploration plan for the construction of underground gas storage Milasín-beech - List of works on the project and an evaluation of the results for the third quarter of 2013
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Waclawik, Petr ; Georgiovská, Lucie ; Patočka, M.
Based on Contract No. G1042011 with the client fy DIAMO state enterprise Stráž, branch GEAM Lower Rožínka was prepared this interim report, which summarizes the list of works, presents and assesses the findings and results for the period July to September 2013, concerning the evaluation of rock mass quality and geotechnical survey was intended to build an underground gas storage facility.
|
|
Progress report on the project VI/2013 Quality Assessment HM and geotechnical exploration plan for the construction of underground gas storage Milasín - Bukov - List of works on the project and an evaluation of the results for the first quarter of 2013
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Waclawik, Petr ; Georgiovská, Lucie ; Patočka, M.
Based on Contract No. G1042011 with the client fy DIAMO state enterprise Stráž, branch GEAM Lower Rožínka was prepared this interim report, which summarizes the list of works, presents and assesses the findings and results for the period January-March 2013, concerning the evaluation of rock mass quality and geotechnical survey was intended to build an underground gas storage facility.
|
|
Progress report on the project VII/2013 Quality Assessment HM and geotechnical survey for construction of an underground gas storage Milasín - Bukov - List of works on the project and the achieved results for the second quarter of 2013
Souček, Kamil ; Koníček, Petr ; Vavro, Martin ; Staš, Lubomír ; Ptáček, Jiří ; Vavro, Leona ; Waclawik, Petr ; Georgiovská, Lucie ; Patočka, M.
Based on Contract No. G1042011 with the client fy DIAMO state enterprise Stráž, branch GEAM Lower Rožínka was prepared this interim report, which summarizes the list of works, presents and assesses the findings and results for the period April-June 2013, on the evaluation of rock mass quality and geotechnical survey was intended to build an underground gas storage facility.
|
| |
| |
|
Ph.D. Workshop 2010 Proceedings
Blaheta, Radim ; Kolcun, Alexej
These proceedings contain abstracts and contributions presented at the fifth Ph.D. Workshop of the Institute of Geonics of the Academy of Sciences of the Czech Republic. The workshop is split into two parts held simultaneously in Ostrava and in Brno, which concern geotechnics, rock mechanics, geophysics and mathematical modeling (Ostrava) and physical and social geography (Brno). The main aim is to bring together the Ph.D. students studying and working or having their supervisors at the Institute of Geonics AS CR. For the whole research community, the workshop gives a possibility to see new results and follow the progress in work in the field of Ph.D. training, which is considered as very important for fulfilling the mission of the institute in the society and training researchers for the future development of the institute.
|
| |
| |
| |
| |