National Repository of Grey Literature 51 records found  previous11 - 20nextend  jump to record: Search took 0.00 seconds. 
Preparation for realization of reinforced concrete storage hall in Polička
Zelinková, Marta ; Kratochvílová, Erika (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
Extension of storage hall in Jirice - gross superstructure
Jůzl, Martin ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
The aim of the thesis is structural and technological solutions gross superstructure Object Extension to production and storage hall in Jiřice. The solution is dependent on the choice of the technological process of installation of steel structures, which will be addressed from a financial and timing perspective. Workflow will be affected by mechanical assembly, wider transport links and facilities construction site.
PFM Flexi storage hall - construction technology project
Chroustovský, David ; Dvořák, Miloslav (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
ZOO garden Brno, Refreshment structure - rough construction
Černohorská, Magda ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
aim of this bachelor thesis is the building-technological solutions of Zoo garden Brno, refreshment structure – rough construction. Part of the thesis is technical report the work site facilities, transport links, reports the machine design, schedule and budget, technical report the work site facilities, problem details, monitoring and test plans, protection of healt and environmental.
Residence Sochorova - apartment building BD 2, construction and technology project
Vybíral, David ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
This thesis describes the building of a residential house called Rezidence Sochorova BD02 in Brno, Žabovřesky. The aim was the creation of the main parts of a constructional-technological project focused on the design of transport relations, the construction site facilities and its machinery, the creation of selected technological regulations and their control and testing plans. To secure safety and to protect health during the construction work itself, a risk plan and a suggestion of safety aids was created. In addition, an itemized budget of the construction, a time plan, environmental protection and a financial and time comparison of using a hopper in contrast to a concrete pump.
Manufacturing hall Otnice- rough upper construction
Urbánek, Lukáš ; Řihák, Pavel (referee) ; Biely, Boris (advisor)
This bachelor’s thesis aims to clearly describe the technological stage of rough upper construction of production hall of the company Beton Brož s.r.o. in Otnice. The content reveals solution to supply parts for assembly and transportation to the site, equipment of construction zone, effective technologies, quality control of performed work, ensuring of safety and health profection at work, schedule and construction budget. The main effort is to suggest the proces of work in order to utilize benefits of the steel skeleton, particularly the speed of construction.
Selected parts of Construction-Technological Project - SCIENTIFIC-TECHNICAL PARK TRIANGL
Výstup, Petr ; Štěrba, Martin (referee) ; Čech, David (advisor)
The topic of this diploma thesis deals with the solution of selected parts of building technology design of Scientific and Technical Park Triangl that is planned to be constructed in Uherske Hradiste. This complex of buildings will be used for civil, administrative and residential purposes. The thesis describes creation of foundation constructions, design of reinforced concrete frames, transportation of building materials and machinery to the building site. This thesis also contains a design and a technical report about facilities of the construction site, pre-defined mechanical assembly, control and test plans and the budgets and schedules of the construction work. Required applications to carry out the construction, suggestions for reinforcement of the foundation construction as well as financial costs are also included in the thesis.
Construction of a sports hall in Nové Město na Moravě - construction technology project
Tomášek, Martin ; Valenta, Michal (referee) ; Biely, Boris (advisor)
This diploma thesis deals with the construction technological preparation of a sports hall in Nové Město na Moravě. The aim of the work is the most optimal design of the construction process. The work contains a technical report of construction technology project, coordination situation of construction with wider links of transport routes, calculation of construction according to THU, time and financial plan of construction, study of main technological stages of building, construction site project, design of main construction machines and mechanisms, building, time schedule of the main building, technological regulation, control and test plan, environmental and safety risks with a plan of their specific solutions for the cladding of skeleton Kingspan panels. Part of the work is also an alternative design of internal partitions.
Apartment building Bílá hora - gross substructure
Michalčíková, Lucie ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this bachelor thesis is the building-technological solutions of gross substructure to apartment building Bílá hora. Part of the thesis is technical report the work site facilities, technical regulation of selected works, monitoring and test plans, reports the machine design with associated transport links, plan of safety and protection of health, environmental, budget and schedule.
Installation of an industrial building in Sudoměřice
Šagát, Pavel ; Selník, Petr (referee) ; Vlčková, Jitka Laura (advisor)
The bachelor thesis aids to describe the constructional and technological phase of the rough development of the Production and Assembly Hall of PRIMARC s.r.o. situated in Sudoměřice. The kontent of the thesis is the solid project’s technical report, the solution of logistics of the oversized transport, suggesting of the machine setup, the equipment of the construction zone, the technological method of prefabrication skeleton, the itemized budget, time schedule, the inspection and test plan and the site safety and health plan. In the attachment there are the assembly drawings of all components construction, the equipment of the construction zone, the drawings of point of interest for designed path, the logistics and safety markings, the inspection and test plan, time schedule and the itemized budget of the hall that is being constructed.

National Repository of Grey Literature : 51 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.