National Repository of Grey Literature 6 records found  Search took 0.00 seconds. 
Footbridge over Morava River, Mikulčice - Kopčany
Bílek, Jaroslav ; Konečný, Vojtěch (referee) ; Křižan, Lukáš (advisor)
The topic of my master's thesis is a concept and evaluation of a new steel construction of a foot bridge for pedestrians and cycles across the river Morava. The concept has two alternatives. Option 1: The foot bridge has three spans. The span lengths are 27+81+27m, the middle span is stiffened by an arc. There is a bridge deck that consists of a cellular beam which is locked onto the arc. The bridge deck is lower, steel and orthotropic. The arrangement of rods is radial. Option 2: The middle span is stiffened by two arcs bowed to each other. The bridge deck consists of two beams with crossbeams and is locked onto the arcs. The bridge deck is again lower, steel and orthotropic. The arrangement of rods is radial. The wind bracing has a shape of a Vierendeel beam.
Analysis of Private Information from FAT32
Križan, Lukáš ; Rychlý, Marek (referee) ; Očenášek, Pavel (advisor)
The aim of this thesis was to create an application which can search for and recover specific files in the file system FAT32, and subsequently extract sensitive information from these files. The first part of this thesis describes the principles underlying FAT32, and focuses on how the analysed applications store information. The second part outlines the application and describes its implementation and simulations.
Bridge crossing over Svitava river and railway track in Blansko
Smělíková, Petra ; Konečný, Vojtěch (referee) ; Křižan, Lukáš (advisor)
The aim of the Diploma Thesis is elaboration of study of bridge crossing over the Svitava river and ČD railway track in Blansko. It concerns a five-pole steel beam road bridge with through-span which carries road of the third category. The static system of the construction is solved as solid-web beam of 1.3 meters height which is in three middle spans reinforced by truss construction with top chord and system of diagonals without verticals. The height of the main beam where reinforced by trusswork is 4.75 meters. The width of spans in the road axis is 18.5 + 30.525 + 44.4 + 30.525 + 18,5 metres. The bridge deck consists of steel cross beams bonded with reinforced concrete slab of 200 millimeters of thickness. The drive-through width of the roadway is 7.0 meters. The bridge is fitted with right-sided walkway placed on steel cantilevers. The walk-through width of the walkway is 3.0 meters. Material used is S355 Steel, C30/37 Concrete and S460 Steel which is used for marginal spans of the bridge. Load-bearing construction is assessed in compliance with current technical requirements laid down by European Directives, so called “Eurocodes”. The calculation of inner powers is performed using the Scia Engineer 2013.1 software.
Analysis of Private Information from FAT32
Križan, Lukáš ; Rychlý, Marek (referee) ; Očenášek, Pavel (advisor)
The aim of this thesis was to create an application which can search for and recover specific files in the file system FAT32, and subsequently extract sensitive information from these files. The first part of this thesis describes the principles underlying FAT32, and focuses on how the analysed applications store information. The second part outlines the application and describes its implementation and simulations.
Bridge crossing over Svitava river and railway track in Blansko
Smělíková, Petra ; Konečný, Vojtěch (referee) ; Křižan, Lukáš (advisor)
The aim of the Diploma Thesis is elaboration of study of bridge crossing over the Svitava river and ČD railway track in Blansko. It concerns a five-pole steel beam road bridge with through-span which carries road of the third category. The static system of the construction is solved as solid-web beam of 1.3 meters height which is in three middle spans reinforced by truss construction with top chord and system of diagonals without verticals. The height of the main beam where reinforced by trusswork is 4.75 meters. The width of spans in the road axis is 18.5 + 30.525 + 44.4 + 30.525 + 18,5 metres. The bridge deck consists of steel cross beams bonded with reinforced concrete slab of 200 millimeters of thickness. The drive-through width of the roadway is 7.0 meters. The bridge is fitted with right-sided walkway placed on steel cantilevers. The walk-through width of the walkway is 3.0 meters. Material used is S355 Steel, C30/37 Concrete and S460 Steel which is used for marginal spans of the bridge. Load-bearing construction is assessed in compliance with current technical requirements laid down by European Directives, so called “Eurocodes”. The calculation of inner powers is performed using the Scia Engineer 2013.1 software.
Footbridge over Morava River, Mikulčice - Kopčany
Bílek, Jaroslav ; Konečný, Vojtěch (referee) ; Křižan, Lukáš (advisor)
The topic of my master's thesis is a concept and evaluation of a new steel construction of a foot bridge for pedestrians and cycles across the river Morava. The concept has two alternatives. Option 1: The foot bridge has three spans. The span lengths are 27+81+27m, the middle span is stiffened by an arc. There is a bridge deck that consists of a cellular beam which is locked onto the arc. The bridge deck is lower, steel and orthotropic. The arrangement of rods is radial. Option 2: The middle span is stiffened by two arcs bowed to each other. The bridge deck consists of two beams with crossbeams and is locked onto the arcs. The bridge deck is again lower, steel and orthotropic. The arrangement of rods is radial. The wind bracing has a shape of a Vierendeel beam.

See also: similar author names
1 Križan, Ladislav
2 Križan, Lukáš
Interested in being notified about new results for this query?
Subscribe to the RSS feed.