National Repository of Grey Literature 301 records found  beginprevious61 - 70nextend  jump to record: Search took 0.01 seconds. 
Implementation of Superstructure of Apartment Building in Čierna Voda - Chorvátský Grob
Raučinová, Veronika ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of the bachelor thesis is to process a technological project for the technological stage of the shell construction of an apartment building in the town of Chorvátsky Grob in the local part of Čierna Voda. The construction system of the apartment building is wall-mounted, made of Porotherm blocks. Ceiling structures are monolithic reinforced concrete slabs. The content of this work is the elaboration of technological regulation for vertical load-bearing and horizontal load-bearing structures, technical report of construction-technological project, time schedule of construction of assigned technological stage, situation of construction site with wider transport relations, construction organization including drawing of construction site equipment, budget for gross construction, control and test plan. Furthermore, the work deals with traffic routes to the construction site, safety and health protection at work, design of machine assembly and comparison of variants of the horizontal load-bearing structure.
Implementation of Superstructure of Timber House in Bratislava
Oláhová, Loreta ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The bachelor's thesis deals with the elaboration of a technological regulation for the processing of the superstructure of a family house, ie a description of the rough construction, CLT panel and its alternatives and, last but not least, roofing. Part of the bachelor's thesis is also a technical report focused on the selected level of construction, the solution of transport routes, the design of the machine set or the proposal for the classification of the construction site, elaboration of individual regulations, comparison of proposed alternatives. Costs incurred during the implementation of the rough construction of the 2nd floor and partial costs from the 1st floor are processed in the item budget. The basis for the elaboration of this work was a drawing documentation from the previous work published on the VUT thesis page.
Implementation of Roofing of Hotel in Třebíč
Schreiber, Jiří ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this bachelor´s thesis is the emplementation of roofing of hotel in the city of Třebíč. Technological projects for realization warm flat roof and for roof terrace were made. The inspections and the test plans deal with the quality of these processes. A budget and a time schedule have been drawn up as well, there is also a plan for a set of necessary machines. In addition, the thesis includes a project of site equipment and review of broader transport relation. For the most accurate data’s was made the laying plan.
Construction Project for Implementation of Ponava City - 1st phase
Gunár, Juraj ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with construction project of the prepraration and realisation of the 1st stage of Ponava City residential district in Brno, Královo Pole. A construction technological project, a construction plan from a financial and time point of view, a design of construction site equipment, a design of construction machinery and a health and safety plan were prepared for a multifunctional building. Furthermore, the content includes more detailed technological regulations of reinforced concrete structures and related inspection and test plans.
The company premises SIWE, assembly gross superstructure production hall
Drexler, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with the technological phase of implementing the upper shell construction of a factory building. The main supporting element is a prefabricated reinforced concrete frame, with a peripheral shell of bricks POROTHERM insulated using contact system ETICS. The roof structure is not part of this thesis. This document includes: inventory of quantities, budget, schedule, technical regulations, organizational principles of construction and a comparison of the methods and implementations of two insulation technologies.
Pavilion F of the Elementary School in Šlapanice – Building Construction Project
Barák, Libor ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
Theme of the diploma thesis is an elaboration of a building construction project for Pavilion F of the Elementary School in Šlapanice. This thesis deals with the engineering report for the construction technology project, the study of the implementation of the main technological stages of the building, solving broader transport relations with the design of the building supply, object time and financial plan, time schedule of the main construction object, project of the site facilities, design of the main construction machines and mechanisms for selected technological processes, technological regulation for the execution of monolithic constructions, control plan and test plan for the execution of monolithic constructions, the balance of workers and the deployment of main construction machinery and a health and safety plan for selected construction processes. In this diploma thesis, there are also construction calculation according to technological economic indicators, itemized budget of selected technological processes and formwork drawings.
Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou
Kurková, Dita ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
Production Hall in Otrokovice - Execution of Superstructure
Ševela, Ondřej ; Novotný, Michal (referee) ; Nečasová, Barbora (advisor)
The bachelor thesis deals with the solution of the technological stage of the rough superstructure of a production hall in Otrokovice. The work includes accompanying and summary technical reports, construction situation with wider transport route relationships, technical report of the closer transport relations and the coordination of the oversized transport, bill of quantities for the tackled technological phase, technological regulation for the assembly of the prefabricated skeleton, design of the mechanical assembly, control and testing plan for the tackled technological phase, work safety of the tackled technological phase, prefabricated skeleton assembly budget, and building schematics of the details, assembly and storage of prefabricated elements.
Execution of Production and Storage Hall in Mniší
Šilhová, Kristýna ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The diploma thesis deals with the realization of a production and storage hall for the engineering industry. Part of the realization of the production hall is the demolition work of the existing agricultural building. The reconstruction of the existing premises of locksmith's workshop and dressing room for employees is also being implemented. For the preparation of this project, the thesis deals with the implementation of the main technological stages, technological plans for demolition work and substructure, transport routes of the main building materials and machines, technical report of the building site, time and financial plan of the construction, security measures especially for demolition works, quality control when drilling a pilot.
Apartment building Brno,Vídeňská - preparation and realization construction.
Hlušičková, Lenka ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This Master’s thesis deals with the technological project of the new building apartment house in Brno. This work includes technical reports, site equipment, wider transport relations,budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work, safety plan and risks on the building.

National Repository of Grey Literature : 301 records found   beginprevious61 - 70nextend  jump to record:
See also: similar author names
1 Nečasová, Berenika
Interested in being notified about new results for this query?
Subscribe to the RSS feed.