Reconstruction of the bridge near the village of Plana
Drbohlav, Martin ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
The part of the construction project "Reconstruction of the realization of the bridge at Planá" is elaborated. These are in particular the following: technical report for the construction tech-nological project, object time schedule of the construction, study of the implementation of the main technological stages of construction, project of the building site and implementation of the reinforced concrete structures.
Project planning and management of construction Municipal Authority Přelouč
Malina, Marcel ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The content of this master's thesis is architectural and technological project of new built administration building Přelouč city. This project contains technological instruction how to build supporting structures from reinforced concrete, suggestion of used machinery,time schedule, quality plan, detailed costing, building management, design of work site and plan of work safety.
Technological stage of the rough construction of the residential building in Bratislava
Krajčovič, Matúš ; Novotný, Michal (referee) ; Doubek, Rostislav (advisor)
The subject of my bachelor thesis is the processing of the structural work of tower structure. The construction is based on piles and foundation plate. The thesis presents the construction solutions from the perspective of construction technology. Part of the work is an accompanying and summary technical report, site drawing and site equipment, broader traffic route relations, timetable, itemized budget, work list with quantities, machine assembly, technological regulation for the monolithic construction – waterproof concrete construction, safety and protection at work, field research of cranes.
Implementation rough superstructure apartment building in Modřice
Růžička, Radek ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The subject of the thesis is the solution of the technological stages of the upper gross building of the apartment building in Modřice. The content of the report is a technical report, a solution of wider transport relations, a statement of the level, a technical regulation for vertical and horizontal construction, a technical report of the construction equipment, a control and test plan, a machine assembly, a safety measure and a variant solution of lifting mechanism with other assignment tasks.
Realization of a polyfunctional building Pardubice
Výborný, Václav ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The main contens of the thesis is solving a construction-technological project substructure and the upper shell construction of a polyfunctional building in Pardubice. Excavation and foundation work are done in section A and B1 and B2. Drilled piles are foundation of a polyfunctional building. Drilled piles are support of reinforced concrete grillage, which are from strips foundation and foundation pads. Cast-in-place concrete frame is a form of load-bearing structure, which contens plate ceilings, pillars and walls. Peripheral masonry is from hellow clay blocks, which are between cast-in-place concrete frame. Diploma thesis includes technical report, plan of building side, schedule and the budget of the building, technological instructions, radon prevent, control and testing plan, safety, balance resources, selected constructional details, machinery composition, bill of quantities.
Implementation of the gross substructure pumping station
Zemánek, Miroslav ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
This Bachelor thesis deals with the technological processes regarding the implementation of the gross substructure of a gas station in Uherský Brod. Thesis includes technological regulations for executing earthworks and carrying out the monolithic foundations. Thesis provides an insight into the inspection and testing plan, the situation concerning broader transportation relations with traffic routes, statement, land area, budget, timetable, proposal of mechanical assembly, safety regulations and organization of the construction.
Implementation of the gross overhead construction of the storage hall in Hradec Králové
Štěpánek, Michal ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The bachelor thesis is aimed at the construction and technological solution of the rough top structure of the storage hall in Hradec Králové. Bachelor thesis contains technological background for the execution of rough construction. This work aims to solve problems with the procedures for the implementation of masonry and prefabricated structures. I focused on the part of the hall that will serve for administration and I devised the implementation procedure and the time consuming. As the project documentation did not have anything to do with the ceiling 1.NP, I had to solve the project site first and then I did the implementation technology. I also compared the two lifting devices in terms of economic and time requirements. Another objective was to solve the transport of individual building materials on site. The proposed solution is based on my personal experience with the implementation and consultation of leading experts in the field. The aim of this work is to propose an optimal course of implementation of the storage hall.
Construction technology project of a residential park in Olomouc
Horák, Matouš ; Nečasová, Barbora (referee) ; Doubek, Rostislav (advisor)
The subject of the work is the construction and technological project of a residential park in Olomouc. Part of the thesis is a technical report on the construction technology project, which is followed by a study of the main technological stages of the construction object. Furthermore, part of the work includes solutions for wider relations of transport routes and the coordination situation of the construction. I designed the equipment of the construction site for the rough construction of the first stage of construction, including the main construction machines and mechanisms, the time and financial plan for all objects, which is followed by a detailed overall time plan for the realization of the main construction object. Next, itemized budgets with measurement statements were processed. Another part of the work is a plan to secure material resources for specific types of work and objects. A technological regulation with an inspection and test plan for monolithic vertical and horizontal structures and a health and safety plan was prepared. A fire safety solution for the entire building was also developed. Finally, an indicative calculation of the entire building was processed according to the technical and economic indicators for the current year.
Block of flats Palmovka - project planning of construction.
Lux, Ondřej ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
The thesis contains selected parts of building technology project for the construction of residential house in Prague, section Palmovka. The goal is building a technology solution entered the building on the basis of technical documents supplied by the designer. This work includes technical report on construction technology project, time and financial object plan, schedule substructure using a computer program Contec, study the implementation of major technological stages of the main building, including diagrams of the construction process, the project site equipment, design of the main mechanisms, inspection and test plan with technological instruction for earthwork and foundation of the building, the maintenance plan.
Construction technology project of the area for sports purposes in Hradec Králové
Dyntar, Lukáš ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The aim of my master thesis is to solve a construction and technological project of a sports complex in the regional city of Hradec Králové. The content of the thesis is a technical report for the construction and technological project, solution of wider transport relations, calculation of the construction according to THU, time and financial plan of the construction, study of the implementation of the main technological stages, design of the construction site equipment, design of the main construction machines and mechanisms, time plan for the rough construction SO 01, itemized budget for the rough construction of SO 01, technological regulation for monolithic reinforced concrete ceilings SO 02, inspection and testing plan for monolithic reinforced concrete ceilings SO 02, safety aspects of construction, source limits, traffic signs near the construction site, noise study, LEED 2009, schematic section of the temporary entrance, alternative floor solution for SO 01.