National Repository of Grey Literature 106 records found  beginprevious36 - 45nextend  jump to record: Search took 0.01 seconds. 
INTERSPACE (MORFOLOGY OF UNSEEN)
Stehlíková, Iveta ; Ptáček, Jiří (referee) ; Vítková,, Lenka (advisor)
The main idea of my diploma work is the view into the invisible world of microscopic objects. Their forms and structures are not used as such, but they are taken out from them and new forms are created from them. With a exaggeration absurdity and illustrating, I create new dimensions of the world that can not be seen by the eye or the device. Using the combination of spatial and also flat painting, I point to the paradox of the existence of space as the human being perceived it.
THE TEXTURE
Rabochová, Agáta ; Ptáček, Jiří (referee) ; Kvíčala, Petr (advisor)
The subject of the thesis is a series of paintings. It is based on painting concept of drapery. The history of art is accompanied by drapery almost from the beginning. I´m interested in the variety of aproaches, once the drapery supports the meaning of the painting, once it is the main object of the paintwork. My intention is to paint a series of pantings, which will follow and complement the historic aproach.
Partial Report IV / 2016 - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Ptáček, Jiří ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Koníček, Petr ; Souček, Kamil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report III / 2015 (Waclawik et al. 2015) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.
Fulltext: content.csg - Download fulltextPDF
Plný tet: UGN_0464907 - Download fulltextPDF
The study of the influence of the single entry and pillar mining method in seam No. 40 in Jan-Karel protective shaft pillar, location CSA Mining Plant 1 on Jan and shaft No. 2 downcast shafts and on the CSA 3 upcast air shaft, surface and surface objects
Ptáček, Jiří ; Kajzar, Vlastimil ; Koníček, Petr ; Kukutsch, Radovan ; Waclawik, Petr ; Jiránková, E.
The presented method single entry room and pillar solves the possibility of applying single entry room and pillar mining method, where roadheaders are used, newly in two variants. According to the first of them will be entries and intra-entries inundated with a time lag with fly ash mixtures. The second variant will be excavated only basic entries with a width of 6.8 meters. They will not be flooded. The purpose of the study is also adding calculations of potential and the expected impact of single entry room and pillar method on the surface and surface objects and also the expected impact on the shafts in Jan-Karel protective shaft pillar.
My Bachelor's Thesis
Moravanský, Tomáš ; Nadaud, Pierre (referee) ; Ptáček, Jiří (advisor)
Videomeaning is the second of a series of pictorial compositions. They build on linking words and their meanings, each one kreujúcich framework. In the version of the genre are the outputs of the four characters in the same situation in one room, each of which can function as a single unit with an inherent background as well as a sample, cut a kind of fictional universe, which in his work long build. Imagine more storey house on each floor and several rooms. Monochrome spaces throughout the building, where the color and atmosphere determined by light and sound in every room differently. As one of the rooms, the floors, the theme of which is Videomeaning. Room inhabit in this case four characters, each living their own lives. The characters carried by description, white card on which the explanation of their meaning in the simplest form possible. They are the only other inhabitants of the house. On this floor is their meaning, have meaning. Explanation importance. The first plan. Name, origin, function and material. Some character is a separate room, another may be the opposite in greater numbers, and the focus is more on the compositional enjoyment. Indeed, each it is operating on their own, unless in one act with several characters to one meaning. For this moment, I chose the example of the four figures that work in both cases.
Monitoring project of the deformation stress state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH - Quarrying II
Waclawik, Petr ; Koníček, Petr ; Ptáček, Jiří
This is a project monitoring of the deformation stress state of the rock mass during mining decant no. 30 (634) within the trial operation of new methods corridor - a pillar in the protective pillars jam CSM Mine, site Sever
Partial Report III / 2015 - Rating of the deformation stress monitoring state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Ptáček, Jiří ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Koníček, Petr ; Souček, Kamil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report II / 2015 (Waclawik et al. 2015) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.
Bukov PVP underground research laboratory - geotechnical conditions of construction
Souček, Kamil ; Vavro, Martin ; Staš, Lubomír ; Koníček, Petr ; Ptáček, Jiří ; Waclawik, Petr ; Vavro, Leona ; Lednická, Markéta ; Kaláb, Zdeněk ; Šňupárek, Richard ; Vondrovic, L.
Bukov PVP Underground Research Laboratory (Bukov URL) is designed to be a test site for the evaluation of properties and behavior of the rock mass which is of similar type as selected candidate sites in the Czech Republic. It is situated at a depth corresponding to the proposed storage depth of the final locality for the national deep repository of high-level radioactive waste. The Bukov URL, the construction of which has begun in 2013, is situated in the southern part of the Rožná uranium deposit, at the northeastern periphery of the Strážek Moldanubicum close to its contact with the Svratka Unit. The rock mass is composed of relatively monotonous rock sequences primarily of a volcanosedimentary origin. They are currently represented, due to the subsequent tectonometa-morphic development, by migmatized biotite paragneisses up to stromatitic and/or oftalmitic migmatites, amphibole-biotite to biotite-amphibole gneisses, and amphibolites. The workings of the Bukov URL are situated on the level 12 of the Bukov-1 shaft, at the depth of about 600 m below the earth’s surface. The Bukov URL is still under construction and the research works by the consortium of several organizations – ÚJV Řež, a.s., Czech Geological Survey, Institute of Geonics of the CAS, v.v.i., and Arcadis CZ, a.s. - are carried out simultaneously. The research activities focus on a complex geological and geotechnical characterization of the rock mass of interest, which is vital for the realization of further research in situ. This paper briefly describes the technical solution of the Bukov URL and the process of its construction.
SILK
Baluch, Matúš ; Ptáček, Jiří (referee) ; Cenek, Filip (advisor)
My diploma thesis is instalation, which elements are based on principales of ready-made. Documentation of living performance. Site-specific charakter, objects, and documents are common, that are one from of physical, psychical, and social injuries. Trought the installation and added text with its full range of form I am changing the discurse.
Audio-visual Installation
Kachtík, Petr ; Hrůza, Tomáš (referee) ; Ptáček, Jiří (advisor)
This thesis is concerned with the relationship between sound and image, their manipulation in real time. The main topic of this work is the permeation of these two elements into a single composition. I work with documentary footage witch I try compose according to the principles of VJing.

National Repository of Grey Literature : 106 records found   beginprevious36 - 45nextend  jump to record:
See also: similar author names
11 PTÁČEK, Jan
3 Ptáček, J.
7 Ptáček, Jakub
11 Ptáček, Jan
Interested in being notified about new results for this query?
Subscribe to the RSS feed.