Preparation for Building Realisation and Building Management
Hlinšťák, Filip ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The master’s thesis is planning selected parts of preparation and realization of the extension of production hall with warehouses in Petrovice u Karviné. The thesis contains technical reports, solution of wider traffic relations, study of main technological stages, design of building site, design of construction machinery, the technology solutions for installation of roofing including HSF and CTP, design of anchors for roofing, time and financial planning of construction.
Preparation and Organization of Construction
Hladký, Dominik ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
The Multifunctional Center of the Village Sušice, Gross Upper Structure
Ranocha, Petr ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis is focused on the construction technology project of the gross upper superstructure of an apartment building in the village Šumice. It is a three-storey brick building with monolithic ceiling structures. The building is roofed with a shed roof with wooden construction. The thesis contains a technical report, broader transport routes, bill of quantities, technological procedures of construction, construction schedule technical report of construction site equipment, design of machine assembly, control and test plan, safety of work, and and comparinson of different materials of the cladding.
Apartment House Kasárny E in Uherské Hradiště, Gross Upper Structure
Beníček, Matěj ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The subject of this bachelor thesis is the technological solution of the implementation of the rough upper constructions of the apartment building in Uherské Hradiště. Content pages related to business travel, technology regulations for carrying vertical load-bearing and non-load-bearing walls, machinery design, site equipment solutions, site safety and health protection concepts and inspection and test plan for masonry construction.
Apartment house Hubertus in Karlova Studánka - construction technology project
Dvořák, Miloslav ; Řihák, Pavel (referee) ; Šlanhof, Jiří (advisor)
Work deals with the technology of Hubertus Apartment building at Karlova Studánka. The content of this work is the technological specification, technical report, building equipment, design of the crane, a timetable and a detailed object, balance of resources, inspection and test plan, work safety and environmental protection, the maintenance building and construction details.
Experimental research of suitability and durability of sealants used in civil engineering
Hanzelková, Martina ; Schmid, Pavel (referee) ; Sedlák,, Petr (referee) ; Šlanhof, Jiří (advisor)
The dissertation thesis is focused of the method of testing the building sealnats. This is a summary of the research focused on the evaluation of sealants in interaction with the underlying materials. Attention is focused on the official test methods contained in European technical standards, the benefits of individual methods, their advantages and disadvantages are discussed. Also included are the overall findings of the practical application of the test procedures applied to 10 commercially available industrial sealants on 8 different substrates, including facade lining boards used for lightweight envelope systems. The dissertation thesis contains general conclusions about individual test methods. The research also includes various ways of preparing and conditioning test specimens that simulate different environmental conditions and, in some cases, play a crucial role in the final evaluation of sealants.
Annes, Extension and Building Adjustment of the Building House Neumannova in Brno, Preparation and Realization of Buildings
Martincová, Michaela ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The thesis deals with the technological stage of the rough construction of the annex and the reconstruction of the apartment building on Neumannova Street in Brno-Pisárky. These are earthworks, rough substructure, rough construction, demolition work, and some of the finishing work. The diploma thesis deals with the design of the work process of the works, the design of the machine assemblies, the studies of the implementation of the main technological stages, the preparation of the budget item, the time schedule, the time and the financial plan of the object, the control and testing plan, the material assurance plan and the transport relations. Further, the design of the building facility is processed and a technical report of the building facility is made.
Nursing House in Těmice, Preparation for Building Realisation
Ratajský, Radek ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The subject of this thesis is a preparation of documentation for the construction of the nursing home in Těmice. The work contains budget, schedule, financial plan, construction technological project, technological regulation for trussing construction, inspection and test plan, material resources plan, construction machinery and a safety plan.
Residential House in Kunštát na Moravě, Gross Superstructure
Šedivý, Peter ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
This bachelor thesis deals with the technological stage of the rough top of the residental house in Kunštát na Moravě. It focuses on the implementation of monolithic supporting structures. The work includes the technical report, situation of wider transport relations, item budget with dimension report, construction organization, time schedule, the desing of the machine assemby, technological regulation, the two control and test plans and the work safety.
The Extension of the Business Incubator - South, Rough Superstructure
Sankot, Martin ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The topic of thic bachelor thesis is processing of a technological solution of the rough top construction of the Business Incubator in Brno. It is a new four-storey, non-cellular building for administrative and office activities. The subject of this thesis is processing of a technological regulation for the prefabricated reinforced concrete skeleton. The next parts of the thesis, focused on the phase of the rough top construction, are: technical report, situation with wider relations of the transport routes, plan of the construction organization with the drawing of the building site facilities (equipment), itemized budget with the statement of acreages, schedule of work, inspection and test schedule, design of the mechanical (machine) assembly and the safety of work of the (solved) technological phase.