Technological stage of implementation of the floors in apartment building in Žďár nad Sázavou
Kalců, Martin ; Ing.Petr Selnik (referee) ; Diaz, Yvetta (advisor)
Bachelor`s thesis deal with realization of technological stage of implementation of floors in apartment building in Žďár nad Sázavou. The thesis processes designed layers on five above-ground floors and basement. Thesis suggests to alternative solutions, mistakes in design and their solutions.
SUBSTRUCTURE OF A TRAINING CENTER OF COMPANY BATIST
Možíš, Jan ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
The subject of my bachelor thesis is the construction-technological project of a training center of company Batist, Červený Kostelec. Thesis is focused on the most optimal technological procedures of demolition and groundworks along with base designs substructures. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be comparison of the financial foundation with the original design of reinforced concrete structures on foundation along with compaction of the substrate, the design of the building foundation on bored piles.
SUBSTRUCTURE OF A POLYFUNCTIONAL BUILDING ČESKÁ SKALICE
Výborný, Václav ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The main contents of the thesis is solving a construction-technological project substructure of a polyfunctional building Česká Skalice. Substructure is based on two height levels on bored piles. The first height level is called SECTION A, the second height level is called SECTION B. The base structure consists an angled base plate, which consists from two horizontal plates shifted against each other about one floor and between plates is a basement wall. The base plate in SECTION A is solved together with ceiling plate 1. PP. Further there is solved structures for two lift shafts . The thesis includes a technical report, technologic instructions, plan of building site, selected constructional details, cost estimate, schedule, machinery composition, control and testing plans, safety at work and environmental protection.
The solution of technological phase of load bearing structure administration building Synot Jaktáře
Malečík, Patrik ; Šlanhof, Jiří (referee) ; Mohapl, Martin (advisor)
The main subject of Bachelor thesis concerns technological phase of load bearing structure administration building Synot Jaktáře. The building serves as secretarial object and data centre placed at fourth floor. The building has four floor above and no floor bellow the ground. The construction is made like monolithic core structure.
Administrative building of company Energis, Hradec Králové - technological stage of sheathed
Findejs, Lukáš ; Selník, Petr (referee) ; Novotný, Michal (advisor)
This thesis is focused on comparing the two variants sheathed and installation of metal ventilated façade and installation of insulation Kingspan. The thesis deals technologically provisions installation, design of mechanical assemblies for mounting cladding to organization, including technical report building equipment and drawing of the building equipment, quality requirements for individual variations cladding and safety and health at work, including developing a plan of risks.
Manufacturing premises Hylváty – Implementation of horizontal structure and roofing
Večeře, Tomáš ; Novotný, Michal (referee) ; Mohapl, Martin (advisor)
The thesis focuses on construction technology of horizontal structure and roofing on manufacturing premises in Hylváty. It includes technical report, technological regulation, monitoring and test plan, project of the construction site facilities, machinery set, budget, construction time table and visualized transportation of oversized concrete girder to the construction site.
Garage Hroznová, Brno - implementation of slope stabilization and foundation structure
Všetečka, Jan ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
This bachelor’s thesis is focused on the technological implementation phase of realization sheeting structure with the subsequent establishment of the garage building in Brno. The work includes the implementation of technology, design of mechanical assemblies, a solution building site, budget, schedule, checking and test plan, safety and environmental protection during execution relevant construction.
Research Center of FIT VUT in Brno - solution of rough construction
Malaník, Jan ; Nečasová, Barbora (referee) ; Novotný, Michal (advisor)
This thesis deals with the construction and operation: gross upper structure of the Research Center of Information Technology VUT in Brno. The aim is to detail the process equipment set, the schedule, itemized budget, inspection and test plan, optimal workflow, transport links and site equipment.
Proposal of Site Facilities
Chalabala, Martin ; Aulehla, Jan (referee) ; Nováková, Jana (advisor)
The thesis focuses on the description of the function and structure of the site facilities, requirements for the planning and implementation and operation of the project of the front mill room. Without a detailed description of these aspects is not possible to design a functional operational site of this type of project. So the aim of this thesis is to provide necessary theoretical base, that is later applied on the concrete construction of the pre-grinding hall in Prachovice cement works.
Manufacturing building in Černá Hora, implementation of carcass superstructure
Hrouzová, Žaneta ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
My bachelor thesis deals with the solution of the technological stage of the montage of the steel construction and also with the roofing of the production hall in Černá Hora. It includes the technological report, the technological regulations, the monitoring and test plan, the project of the construction site facilities, machine set and time frame of the construction.