National Repository of Grey Literature 1,484 records found  beginprevious1450 - 1459nextend  jump to record: Search took 0.00 seconds. 
The gross superstructure of the apartment building
Hoferek, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
This bachelor’s work deals with the realization of the rough upper construction of the appartment block. The aim was to elaborate the technological regulations, to specify the mechanization for the set technological phase, the occupational safety, the quality of the implementation and the total duration of the phase of the rough upper construction with respect to the economic point of view. The basis for the development of the project was the partial implementing documentation of the building.
Construction of the hall with the administration, Velká Bíteš - solution of the stage floors
Kladivo, Jiří ; Mohapl, Martin (referee) ; Novotný, Michal (advisor)
For my bachelor thesis I´ve chosen a topic concerning the stages of floors in a building which is composed of two parts. The first part is a storage hall and the second is two – floor administrative building. This building is situated to the south of Velká Bíteš. This thesis contains technological instructions and a checking and testing plan for these two buildings, which is used for the construction of the floors. Others parts of my bachelor thesis are: omnibus technical report, the facilities of the building site, suggestion of machine composition, healt and safety at work, the situation of wider relations, itemized budget and the time schedule.
CONSTRUCTION OF A DEPARTMENT STORE IN MLADÁ BOLESAV - SOLUTION OF GROSS SUBSTRUCTURE
Škopík, Michal ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This bachelor's thesis deals with solution of gross substructure a department store in Mladá Boleslav. In this thesis is solved a technological specification for implementation of earthworks and implementation of foundations and vertical supporting constructions of gross substructure. More specifically deals with traffic situation around building, time schedule of works, proposal of machine assemblies, ensuring qualitative requirements, safety at work and budget. This thesis is very interesting about solution of construction organization, because this construction is in the middle of housing estate. The basis for this thesis was a drawing documentation for realization of this construction.
SUBSTRUCTURE OF A POLYFUNCTIONAL BUILDING ČESKÁ SKALICE
Výborný, Václav ; Špinar, Petr (referee) ; Kantová, Radka (advisor)
The main contents of the thesis is solving a construction-technological project substructure of a polyfunctional building Česká Skalice. Substructure is based on two height levels on bored piles. The first height level is called SECTION A, the second height level is called SECTION B. The base structure consists an angled base plate, which consists from two horizontal plates shifted against each other about one floor and between plates is a basement wall. The base plate in SECTION A is solved together with ceiling plate 1. PP. Further there is solved structures for two lift shafts . The thesis includes a technical report, technologic instructions, plan of building site, selected constructional details, cost estimate, schedule, machinery composition, control and testing plans, safety at work and environmental protection.
Gross superstructure of a residential building
Duda, Martin ; Hanzelková, Martina (referee) ; Kantová, Radka (advisor)
The main construction work is subject to technological solution vertical and horizontal constructions of residential building in Opava. Bachelor's thesis solves construction progress itself, used technologies and ensuring required conditions for safe and stepless constructing. The basis for the development of the project was the partial implementing documentation of the building.
Administrative building of company Energis, Hradec Králové - technological stage of sheathed
Findejs, Lukáš ; Selník, Petr (referee) ; Novotný, Michal (advisor)
This thesis is focused on comparing the two variants sheathed and installation of metal ventilated façade and installation of insulation Kingspan. The thesis deals technologically provisions installation, design of mechanical assemblies for mounting cladding to organization, including technical report building equipment and drawing of the building equipment, quality requirements for individual variations cladding and safety and health at work, including developing a plan of risks.
Manufacturing premises Hylváty – Implementation of horizontal structure and roofing
Večeře, Tomáš ; Novotný, Michal (referee) ; Mohapl, Martin (advisor)
The thesis focuses on construction technology of horizontal structure and roofing on manufacturing premises in Hylváty. It includes technical report, technological regulation, monitoring and test plan, project of the construction site facilities, machinery set, budget, construction time table and visualized transportation of oversized concrete girder to the construction site.
Technological phase of supporting frame's realization of the transfer station at waste dump Uhy
Doubek, Rostislav ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
This bachelor thesis deals with construction-technological phase of supporting skeleton structural system's realization of the transfer station at waste dump Uhy. It contains operating procedure, equipment of the construction site, time schedule, machinery, control and testing plan, work safety, calculation and alternative proposal for prefabricated part from reinforced concrete. The alternative proposal solves sizing of the reinforced concrete element, calculation and machinery.
Garage Hroznová, Brno - implementation of slope stabilization and foundation structure
Všetečka, Jan ; Henková, Svatava (referee) ; Novotný, Michal (advisor)
This bachelor’s thesis is focused on the technological implementation phase of realization sheeting structure with the subsequent establishment of the garage building in Brno. The work includes the implementation of technology, design of mechanical assemblies, a solution building site, budget, schedule, checking and test plan, safety and environmental protection during execution relevant construction.
Wellness Center in Kuřim - solution of rough construction
Sigmund, Martin ; Mohapl, Martin (referee) ; Novotný, Michal (advisor)
The content of this thesis titled "Wellness Center in Kuřim” - solution of rough construction" is building - technologal solution of building together with technical, time, financial and legislative solutions of selected building process.

National Repository of Grey Literature : 1,484 records found   beginprevious1450 - 1459nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.