National Repository of Grey Literature 107 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Construction technology study of the production hall in Znojmo
Smatana, Roman ; Nevosád,, Zdeněk (referee) ; Lízal, Petr (advisor)
This master thesis deals is processed constructive technological project of realization factory and storage building in Znojmo. Master is thesis includdes model of the building site accessories, technology procedure, time schedule, financial heftiness ,check and test plan, budget ,occupational safety.
Technological phase gross superstructure assembled house
Stehlík, Jakub ; Štěrba, Martin (referee) ; Henková, Svatava (advisor)
Subject of this bachelor´s thesis is the upper gross production technology of family house in Bílovice nad Svitavou. This work contain technical reports, site family house, device of construction site, technological provisions, overal results, timetable, machine set design, monitoring and test plan, occupational safety.
The Regeneration of a Residential House in Ivančice - The Cladding of a Building
Stuchlík, Vladislav ; Šimáčková, Martina (referee) ; Novotný, Michal (advisor)
The subject of this bachelor’s thesis is offering solution of a technological stage of regeneration a residential building in Ivančice. The thesis includes replacing balconies for loggia, flat roof with polystyrene insulation and insulation cladding contact system from the company Baumit using polystyrene and mineral wool.
Construction technology study of the apartment building Bochorákova
Chloupek, Jan ; Štěrba, Ing, Martin (referee) ; Motyčka, Vít (advisor)
Bachelor thesis contains selected parts of technological studies for the construction of apartment blocks on Bochořákova street in Brno. The processed documents will be discussed primarily a technological study of technological realization of the main stages for the specified object, time and financial plan construction, the basic concept of the building operation, technological code for masonry structures and the technical report for the construction of technological study.
The company premises SIWE, assembly gross superstructure production hall
Drexler, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with the technological phase of implementing the upper shell construction of a factory building. The main supporting element is a prefabricated reinforced concrete frame, with a peripheral shell of bricks POROTHERM insulated using contact system ETICS. The roof structure is not part of this thesis. This document includes: inventory of quantities, budget, schedule, technical regulations, organizational principles of construction and a comparison of the methods and implementations of two insulation technologies.
Implementation of a peripheral cladding of the apartment building in Zlín
Ptáček, Zdeněk ; Pražáková, Jana (referee) ; Mohapl, Martin (advisor)
The subject of this bachelor’s thesis is offering solution of a technological stage of implementation insulation the apartment building in Zlín. The thesis includes repairing of balconies and insulation cladding contact system from the company Weber using stone wool and polystyrene
Construction Technology Solution Roofing of the Apartment House in Hradec Králové, Nerudova Street
Lebruška, Jakub ; Hejl, Martin (referee) ; Mohapl, Martin (advisor)
The subject of this work is to create a construction technology solution of a flat roof of an apartment house and an underground garage in Nerudova street in Hradec Králové. It is about execution of warm flat roof of apartment house and intensiv green roof of underground garage. The work includes technical report, a design of a mechanical assembly, site facilities, bill of quantities, solution of wider transport routes, quality requirement, ensure safety, a budget and a time schedule.
Construction technology study stage execution external cladding of administrative building
Tůma, Daniel ; Novotný, Michal (referee) ; Diaz, Yvetta (advisor)
The content of this bachelor thesis is structurally technological study stage execution external cladding of administrative building Schuss Praha in Prague. The works deals with making of ventilated facade. Thesis solve technological regulation of ventilated facade, principles of organization of construction including technical report of construction site equipment and drawing construction site equipment,design mechanical assembly, inspection and test plan and safety.
Autosalon TOPCENTRUM in Hodonín, implementation of carcass superstructure
Pecháček, Michal ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
This bachelor thesis deals with a construction technology procedure gross superstructure of a car store TOP CENTRUM car in Hodonín. This object has got 3 floors. One of them is underground and two of them are above-ground. The interest area is located in a flat terrain in industrial zone. Supporting system of the building is formed by steel skeletons and supplemental supporting structure of POROTHERM blocks. Ceilings are formed by prefabricated prestressed reinforced concrete panels and also by steel construction. The roof supporting system is made up by trusses and purlins and aslo by steel beams IPE. The construction and technological study of the gross superstructure includes a technical report, plan of routes, technological instruction of steel vertical supporting system and selected part of roof system, plans of inspections and tests, resolution of the building organization, schedule and budget, machine list and occupational safety.
1. Reconstruction of the vocational school Dubňany. Construction Technology Preparation
Dohnálek, Marek ; Hrůza,, Jaroslav (referee) ; Kovářová, Barbora (advisor)
The subject of this technological preparation of construction is to find out scope of work needed for reconstruction of former miners school in Dubňany.In Czech Republic exits plenty of these abandoned places and this master thesis should serve as an example of reconstruction of some theirs parts.Within this project I would like to valorize the experience gained from excursion to foreign countries, where the passive and low-energetic buildings are common.Missing project documentation of some part of this facility was replaced by 3D modelling based on my own laser measurement.The main object SO 01 has been already rebuilt into passive apartment building but without building-technological study and proper project documentation.Due to missing foundations and confidential internal documentation of the construction company is impossible to compare the real material, human and financial resources with those mentioned within this thesis. The master thesis contains technical report for the building-technological project, coordination of the transport routes, chronological and financial plan, realisation of the main technological steps, equipment of the construction project , draft of machinery, time schedule of the main project, plan of getting the needful resources, technological regulations, control and probationary plans, disposal of asbestos reports, owning contract, two roof decks comparison from the point of view of thermal technology and specialization from the building field.

National Repository of Grey Literature : 107 records found   previous11 - 20nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.