National Repository of Grey Literature 12 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Study of connectivity for PV power station
Krejčí, Tomáš ; Bartošík, Tomáš (referee) ; Mastný, Petr (advisor)
Bachelor‘s thesis focused on studying connectivity of PV plant into the distribution system.. The first parts are processed by the conditions of connection of new resources into the distribution system with a focus on photovoltaics. Individual points are taken from the rules of the road grid, which gives the Energy Regulatory Authority. In the second part is given FVS problem. There is a brief history of photovoltaics. More details are described photovoltaic element, its principles, and different types of PV article composition PV panel. There are presented methods of operation FVS. The last section is designed to PVP via PC software.
Evaluation of possibilities for connection of wind farm Drahany 45 MW to 110 kV network
Gregr, Tomáš ; Opat, Jaroslav (referee) ; Topolánek, David (advisor)
This Master's thesis is focused on connecting of new power sources into electrical network, particularly, the steady state and allowed voltage variation in network nodes, which occur in steady state before and after connection of a new power source into distribution network, with regard to valid legislation. The new power source in question is the new wind farm Drahany with active power of 45 MW, which should be connected into distribution network 110kV, operated by distribution company E.ON. The aim of this work is to find the most suitable connection point of a wind farm into distribution network, considering transmission capacity of individual electric lines and voltage variations in network nodes, as well as Drahany wind farm's investor's expenses on construction of a connection line to connection point and the distribution network's operator's expenses on modification of the connection point. Also, methods of calculating of electric networks in steady state are described in this paper, particularly, linear calculations, because these are needed for the calculations in E-vlivy program, in which the possible options of Drahany wind farm's connection into network 110 kV, in various places, were modeled. The description of the E-Vlivy program is also included in this paper. The E.ON company's materials form the basis for this Master's thesis, which will later serve as one of the documents needed for Drahany wind farm’s connection point evaluation into distribution network 110 kV.
Study of Power Plant Connection to Power Network
Sýkora, Martin ; Kurfűrst, Jiří (referee) ; Paar, Martin (advisor)
It is necessary to judge the influences of producers on the electric compounds while creating electrical energy or during the regulation of those existing. These analyses are sorted out by so called studies of connectivity. These calculations analyze the degree of connection of the producer and the standby unit during a break-down. The results of this report are several recommendations for creating such unit and succeeding steps leading to secure the stability and safety of the electric compound operation. The aim of this thesis is to discuss about software for PC solutions for static and dynamic network model, to draft power outlet into a network of generating high voltage, to complete a study of connectivity with respect to all the distortion factor, as increased voltage, inrush current at startup, flicker, harmonic currents, interference ripple, contribution to short-circuit current, reactive power control options, and demands for compensation.
Renewable resources utilisation by execution of the Photovoltaic Power Plant Drásov
Novotný, Tomáš ; Spáčil, Lukáš (referee) ; Kříž, Jiří (advisor)
This master’s thesis discuss the renewable energy source utilisation, to be more precise it describes the Photovoltaic Power Plants. These sources are not only capable of contributing to the regeneration of the environment and to the electricity production, but they are also capable of generating the investor’s economic profit. The individual chapters describe the external factors affecting the project, present condition of the project’s realization, the theory of photovoltaic cells and systems, CCTV camera systems, which are necessary for the power plant security.
Integration of Photovoltaic Power Plants in the Electricity System
Michl, Pavel ; Paar, Martin (referee) ; Mastný, Petr (advisor)
The thesis discuses an integration of photovoltaic power stations to electric network. The first part describes connecting conditions of small sources to distribution system, including administrative requirements, feasibility study, and requirements to the energy meters, measuring, control devices, switching devices and protection. The second part is aimed to describe problems of the photovoltaic system. Solar radiation generating and reducing of its intensity incident upon the earth surface are described in this part. The quantum of produced electric power depends on climatic conditions in the fixed area, seasons, etc. This work also discusses the types of photovoltaic cells and their actual efficiency. Inverters are further important components of the photovoltaic system. The parameters of the inverters have a great influence on the total actual efficiency of the photovoltaic system. Different methods of the photovoltaic panels’ connection with the inverters and their advantages and disadvantages are also mentioned. The supporting structure of the photovoltaic panels and eventually transformer are further important components of photovoltaic system. The work also analyze the methods of connection of the photovoltaic power station to distributive low voltage and medium voltage network, electric energy accumulation and possibilities of the sale of produced electric energy. The large number of the connected photovoltaic power stations has negative influences to electric network. The third part contains the design of a photovoltaic power plant with a capacity of 516,24 kWp on the scoped area in southern Bohemia. The project documentation for the location where the power plant is designed is also made. It contains the design of photovoltaic panels, the design of the inverters to get an optimal power load. This part also contains a calculation of the photovoltaic system losses and the design of transformer and the cable junction calculation of the distributive system. The feasibility study of the power plant connected to distributive system is also conducted. Its delivery rate will be connected to the distribution point Řípov (110/22 kV). The calculation results show us that this photovoltaic power plant can be linked to the distribution system. The final part of this paper contains an economic estimate of the photovoltaic power plant operating and the calculation of the return. An Economic return is influenced by the wide range of values that affect the total return rate. The calculation of an operating economy is made for several variants. The return rate in refer to contemporary redemption price for 2010 with no consideration for a bank loan is 7 years. If we consider the bank loan it would be 12 years. The penetrative reduction of the redemption price is expected for 2011. Calculation works with the decline of 30 %. It would extend the rate of return to 11 years without a bank loan or to 22 years with the bank loan. The bank loan is considered to cover 80 % of the investment.
Evaluation of Possibility of New Source Connection With Regard to Nodal Voltage
Němec, Jan ; Topolánek, David (referee) ; Toman, Petr (advisor)
Connection new source of electrical energy into distribution network is important for existing one for reasons its rating and dimensioning. It is even evaluate, whether possibility connection new source in to network is real and do not endanger continuous running distribution system. This work has shown, what conditions are need realize for connection source into distribution network in view of voltage ratio. Next it must incidence harmonic current and affecting centralized telecontrol signal about reasoning. Against a background examination connection source are administrative acts, which forms basis of successful connection. On basis lets request of connection mostly study of connection working up. This study contains concrete calculation and examination individual factors for connection new source. Next put mind to connection wind power station, because wind power stations are very special source for connection into distribution network. Bigger demands are putting on them and stricter examination of connection to site must be done. Because during time unit (day, week and month) they have various strain diagram. Which makes higher straining of distribution and necessity have reserve of electrical energy for case fail wind power station owing to windless ness. In the end, there is referred to practical examination example of possibility connecting. As this example was chosen examination of wind park to 110 kW network with 32 MVA installed power from view of voltage ratio. Solution process is given by replacement of part of given Picells link and by calculation steady state of node site system with Gauss-Seidels iteration method. After that follows evaluation of voltage change in the site before and after connection of source to the network, which can not be higher than 2%. In this example is this condition satisfied and from a view of voltage ratio there is nothing to obstruct for connection new source to network.
Study of connectivity for PV power station
Krejčí, Tomáš ; Bartošík, Tomáš (referee) ; Mastný, Petr (advisor)
Bachelor‘s thesis focused on studying connectivity of PV plant into the distribution system.. The first parts are processed by the conditions of connection of new resources into the distribution system with a focus on photovoltaics. Individual points are taken from the rules of the road grid, which gives the Energy Regulatory Authority. In the second part is given FVS problem. There is a brief history of photovoltaics. More details are described photovoltaic element, its principles, and different types of PV article composition PV panel. There are presented methods of operation FVS. The last section is designed to PVP via PC software.
Evaluation of Possibility of New Source Connection With Regard to Nodal Voltage
Němec, Jan ; Topolánek, David (referee) ; Toman, Petr (advisor)
Connection new source of electrical energy into distribution network is important for existing one for reasons its rating and dimensioning. It is even evaluate, whether possibility connection new source in to network is real and do not endanger continuous running distribution system. This work has shown, what conditions are need realize for connection source into distribution network in view of voltage ratio. Next it must incidence harmonic current and affecting centralized telecontrol signal about reasoning. Against a background examination connection source are administrative acts, which forms basis of successful connection. On basis lets request of connection mostly study of connection working up. This study contains concrete calculation and examination individual factors for connection new source. Next put mind to connection wind power station, because wind power stations are very special source for connection into distribution network. Bigger demands are putting on them and stricter examination of connection to site must be done. Because during time unit (day, week and month) they have various strain diagram. Which makes higher straining of distribution and necessity have reserve of electrical energy for case fail wind power station owing to windless ness. In the end, there is referred to practical examination example of possibility connecting. As this example was chosen examination of wind park to 110 kW network with 32 MVA installed power from view of voltage ratio. Solution process is given by replacement of part of given Picells link and by calculation steady state of node site system with Gauss-Seidels iteration method. After that follows evaluation of voltage change in the site before and after connection of source to the network, which can not be higher than 2%. In this example is this condition satisfied and from a view of voltage ratio there is nothing to obstruct for connection new source to network.
Renewable resources utilisation by execution of the Photovoltaic Power Plant Drásov
Novotný, Tomáš ; Spáčil, Lukáš (referee) ; Kříž, Jiří (advisor)
This master’s thesis discuss the renewable energy source utilisation, to be more precise it describes the Photovoltaic Power Plants. These sources are not only capable of contributing to the regeneration of the environment and to the electricity production, but they are also capable of generating the investor’s economic profit. The individual chapters describe the external factors affecting the project, present condition of the project’s realization, the theory of photovoltaic cells and systems, CCTV camera systems, which are necessary for the power plant security.
Evaluation of possibilities for connection of wind farm Drahany 45 MW to 110 kV network
Gregr, Tomáš ; Opat, Jaroslav (referee) ; Topolánek, David (advisor)
This Master's thesis is focused on connecting of new power sources into electrical network, particularly, the steady state and allowed voltage variation in network nodes, which occur in steady state before and after connection of a new power source into distribution network, with regard to valid legislation. The new power source in question is the new wind farm Drahany with active power of 45 MW, which should be connected into distribution network 110kV, operated by distribution company E.ON. The aim of this work is to find the most suitable connection point of a wind farm into distribution network, considering transmission capacity of individual electric lines and voltage variations in network nodes, as well as Drahany wind farm's investor's expenses on construction of a connection line to connection point and the distribution network's operator's expenses on modification of the connection point. Also, methods of calculating of electric networks in steady state are described in this paper, particularly, linear calculations, because these are needed for the calculations in E-vlivy program, in which the possible options of Drahany wind farm's connection into network 110 kV, in various places, were modeled. The description of the E-Vlivy program is also included in this paper. The E.ON company's materials form the basis for this Master's thesis, which will later serve as one of the documents needed for Drahany wind farm’s connection point evaluation into distribution network 110 kV.