The second phase shifting I/9 Dubice - Dolni Libchava
Belda, Miroslav ; Jíra, Daniel (referee) ; Kosňovský, Michal (advisor)
Master's thesis will deal with the second phase of shifting I/9 Dubice - Dolni Libchava passing west of the Ceska Lipa with an approximate length of 3 km stretch. Estimated start-up of this section is in 2014. This project should build on in the future by-pass Ceska Lipa and Novy Bor, which is currently without funds for implementation by 2025. Traffic load after completion of the by-pass should be approximately 16500 vehicles / 24 hours in 2030. The section is designed in the category S 9.5 with optional solving two major intersections. This thesis will focus on reducing the cost of construction of the section.
Solution of transfer junction on the Konečného square in Brno after putting the line NSRLD into operation
Rosík, Jan ; Veselý, Josef (referee) ; Smělý, Martin (advisor)
My master‘s thesis is concerned with study of location of tram stop, part od North - South Railway Line Diameter, which is supposed to be in underground level below Konečného square, important transfer junction. According to this location find out the best place to situate pedestrian exits and elevators in nearby streets Nerudova, Kotlářská and Veveří. After building up the station, pedestrian transfers will be safer and time to get into the centre of Brno/ job for commuter people will be shortened. This master thesis also deals with enlargement of tram islands, repositioning of trolleybus stop from Kotlářská street, movement of pedestrians in area and optimization of traffic lines.
Grade-separated interchange Mohelnice-north - Study
Lukáš, Radek ; Hájek, Jaromír (referee) ; Radimský, Michal (advisor)
This diploma thesis deals with the proposal of an alternative solution to the intersection of Mohelnice North crossroads. It compares the current junction design, which is considered inappropriate, with two new proposals for circular intersections. The aim of the thesis is to propose the resultant junction cheaper, smaller and simpler for users.
Full-Scale Pavement Model for Testing of Non-Rigid Pavement Structures Not Only from Recycled Materials
Spies, Karel
The utilisation of recycled materials in pavement construction layers is slowly becoming a major issue in road construction. However, the testing and use of these materials in pavement structures may be different from pavements made of new materials. Therefore, this paper discusses the issue of using recycled materials, especially reclaimed asphalt, in pavement structures. In the main part, the paper focuses on testing the entire road structure using a Full-Scale model. The next part explains the reasons for implementing this model in pavement testing and summarizes the selected foreign literature on the subject. The paper then concludes with possible future methods that could be used to improve the obtained measurement results and to bring the model closer to the actual conditions.
Grade-separated interchange Mohelnice-north - Study
Lukáš, Radek ; Hájek, Jaromír (referee) ; Radimský, Michal (advisor)
This diploma thesis deals with the proposal of an alternative solution to the intersection of Mohelnice North crossroads. It compares the current junction design, which is considered inappropriate, with two new proposals for circular intersections. The aim of the thesis is to propose the resultant junction cheaper, smaller and simpler for users.
The second phase shifting I/9 Dubice - Dolni Libchava
Belda, Miroslav ; Jíra, Daniel (referee) ; Kosňovský, Michal (advisor)
Master's thesis will deal with the second phase of shifting I/9 Dubice - Dolni Libchava passing west of the Ceska Lipa with an approximate length of 3 km stretch. Estimated start-up of this section is in 2014. This project should build on in the future by-pass Ceska Lipa and Novy Bor, which is currently without funds for implementation by 2025. Traffic load after completion of the by-pass should be approximately 16500 vehicles / 24 hours in 2030. The section is designed in the category S 9.5 with optional solving two major intersections. This thesis will focus on reducing the cost of construction of the section.
Solution of transfer junction on the Konečného square in Brno after putting the line NSRLD into operation
Rosík, Jan ; Veselý, Josef (referee) ; Smělý, Martin (advisor)
My master‘s thesis is concerned with study of location of tram stop, part od North - South Railway Line Diameter, which is supposed to be in underground level below Konečného square, important transfer junction. According to this location find out the best place to situate pedestrian exits and elevators in nearby streets Nerudova, Kotlářská and Veveří. After building up the station, pedestrian transfers will be safer and time to get into the centre of Brno/ job for commuter people will be shortened. This master thesis also deals with enlargement of tram islands, repositioning of trolleybus stop from Kotlářská street, movement of pedestrians in area and optimization of traffic lines.