National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Multifunctional house in Brno
Kalíšková, Eliška ; Žák, Libor (referee) ; Boleslavská, Yvona (advisor) ; Petříček, Tomáš (advisor)
The main aim of this work is the solution of a new multifunctional building in Židenice, Brno, on the Corner of Táborská and Nezamyslova. The conception has been set by the place which is very close to the Chapel of St. F. of Assisi and by urban plans an local people’s needs and interests. The building has been designed not to damage the look of the local houses and streets and the first floor has been supposed to be used for another purpose than housing. The house was originally designed only like the first floor building. There are other houses which have got from 3 to 5 floors in neighbourhood streets. Among other places there are grammar school, school of Arts, shops and services. The problem was to place this building among the houses with various height by the special shape of the roof. The final effect causes no disharmony in the streets. This house is situated among the others perfectly in the corner position and keep the other houses‘ height from both of the streets. The aim of the multifunctional object is filled up by the first floor and housing in the floors above. In spite of the fact that there is a lack of the car parks the new underground parking site has been set up. The flats here have been designed according to local people’s interests.
Architectural study of accessible / protected/ spaces
Kalíšková, Eliška ; Myslín, Jiří (referee) ; Boleslavská, Yvona (advisor)
This architectural study offers a solution of the Gemini High School‘s new bulding, /Brno Lesná, the bulding site number 202/9, Vaculíkova street/, and shows a new building of a house of culture with a commercial area instead of today’s school /the bulding site number 253/. The new way of car parking and strenghtened areas of this street are included. The building and pulling down of today’s houses and buildings are devided into 2 phases. In the first phase a new barrier – free school building with a possibility of accommodation and flats is designed /building site number 202/9. This bulding has got two entrances. One from the northern part is for a school and the second one in the west is for the tenants. The school area is spread among the first and the third floor (classrooms, canteen, offfices). The fourh floor is used for students‘ accommodation and for a terrace entrance. There are some flats (2+1, 3+ small kitchen, max. area 120 m) from the fifth to the tenth floors. In the underground the are some tenants‘ cellars and technological rooms for school. The renewed car parking for all the tenants, school visitors and others is provided in Vaculíkova street. After the firt phase of building the new school project will go into the second part. In that time the old school will be pulled down and a new house of culture is designed in this place. There will be restaurant, commercial area, cinema, library – café and gym – fitness. On the first floor there are a restaurant, a library – café a cinema. On the second floor there are a gym – fitness and a commercial area. Car parking for the visitors is provided in the underground - 52 cars + 4 handicapped people. The green roof of this house is designed to be comfortable to watch it from the neighbourhood and do not damage the look of this new building. To finish all this project means to create the public area between the two new buildings. A nice place for meeting people and a cultural events will be bo
Architectural study of accessible / protected/ spaces
Kalíšková, Eliška ; Myslín, Jiří (referee) ; Boleslavská, Yvona (advisor)
This architectural study offers a solution of the Gemini High School‘s new bulding, /Brno Lesná, the bulding site number 202/9, Vaculíkova street/, and shows a new building of a house of culture with a commercial area instead of today’s school /the bulding site number 253/. The new way of car parking and strenghtened areas of this street are included. The building and pulling down of today’s houses and buildings are devided into 2 phases. In the first phase a new barrier – free school building with a possibility of accommodation and flats is designed /building site number 202/9. This bulding has got two entrances. One from the northern part is for a school and the second one in the west is for the tenants. The school area is spread among the first and the third floor (classrooms, canteen, offfices). The fourh floor is used for students‘ accommodation and for a terrace entrance. There are some flats (2+1, 3+ small kitchen, max. area 120 m) from the fifth to the tenth floors. In the underground the are some tenants‘ cellars and technological rooms for school. The renewed car parking for all the tenants, school visitors and others is provided in Vaculíkova street. After the firt phase of building the new school project will go into the second part. In that time the old school will be pulled down and a new house of culture is designed in this place. There will be restaurant, commercial area, cinema, library – café and gym – fitness. On the first floor there are a restaurant, a library – café a cinema. On the second floor there are a gym – fitness and a commercial area. Car parking for the visitors is provided in the underground - 52 cars + 4 handicapped people. The green roof of this house is designed to be comfortable to watch it from the neighbourhood and do not damage the look of this new building. To finish all this project means to create the public area between the two new buildings. A nice place for meeting people and a cultural events will be bo
Multifunctional house in Brno
Kalíšková, Eliška ; Žák, Libor (referee) ; Boleslavská, Yvona (advisor) ; Petříček, Tomáš (advisor)
The main aim of this work is the solution of a new multifunctional building in Židenice, Brno, on the Corner of Táborská and Nezamyslova. The conception has been set by the place which is very close to the Chapel of St. F. of Assisi and by urban plans an local people’s needs and interests. The building has been designed not to damage the look of the local houses and streets and the first floor has been supposed to be used for another purpose than housing. The house was originally designed only like the first floor building. There are other houses which have got from 3 to 5 floors in neighbourhood streets. Among other places there are grammar school, school of Arts, shops and services. The problem was to place this building among the houses with various height by the special shape of the roof. The final effect causes no disharmony in the streets. This house is situated among the others perfectly in the corner position and keep the other houses‘ height from both of the streets. The aim of the multifunctional object is filled up by the first floor and housing in the floors above. In spite of the fact that there is a lack of the car parks the new underground parking site has been set up. The flats here have been designed according to local people’s interests.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.