Design of a 22 kV network in the Lipno area after the integration of the new 110/22 kV transformer station
Žižlavský, Jakub ; Koudelka, Jan (referee) ; Ptáček, Michal (advisor)
This diploma thesis deals with the design of a new 110/22 kV substation in Horní Planá. The substation design addresses, for example, the issue of reducing the load of surrounding power lines from 110/22 kV substations, reducing the size of short-circuit ratios in the surrounding system, reliability and continuity of supply, etc. Furthermore, loads of individual outgoing feeders from the surrounding substations are analyzed, in case they will be connected to a new substation. Following this, the work also addresses the related new decay points of the lines, which are determined by calculation and simulation in the Grizzly program. The simulation results could be used to compare the current load status of individual lines and contribute to the assessment of the possible benefits of both the new substation and the implementation of other modern technologies for faster and more efficient measurement and handling during operating and fault conditions.
|
| |
|
Design of a 22 kV network in the Lipno area after the integration of the new 110/22 kV transformer station
Žižlavský, Jakub ; Koudelka, Jan (referee) ; Ptáček, Michal (advisor)
This diploma thesis deals with the design of a new 110/22 kV substation in Horní Planá. The substation design addresses, for example, the issue of reducing the load of surrounding power lines from 110/22 kV substations, reducing the size of short-circuit ratios in the surrounding system, reliability and continuity of supply, etc. Furthermore, loads of individual outgoing feeders from the surrounding substations are analyzed, in case they will be connected to a new substation. Following this, the work also addresses the related new decay points of the lines, which are determined by calculation and simulation in the Grizzly program. The simulation results could be used to compare the current load status of individual lines and contribute to the assessment of the possible benefits of both the new substation and the implementation of other modern technologies for faster and more efficient measurement and handling during operating and fault conditions.
|
| |