National Repository of Grey Literature 8 records found  Search took 0.01 seconds. 
Architectural and technological project of reconstruction surgeries KPRCH University Hospital Brno
Hačka, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this work is to prepare the implementation of the reconstruction and extension of the Teaching hospital Brno Bohunice. Implementation of major technological stages is addressed in building technological study. Work includes selected legal procedures before the start of construction work, such as opening the envelopes and investor-supplier contract for the work. Further work solution contains selected technological processes of each sub-job phases, complemented by technological regulations, proposals for major construction machinery, selected inspection and test plans. As part of my work I will work with subcontractors to perform CFA piles, so I deal with on demand system for subcontractors, notice of award, issuing orders and delivery site for subcontractors. I believe that the subject of occupational health and safety on the jobsite is an important chapter construction and will therefore address the safety and health of people at work drawing up a plan OHS and OHS coordination meetings. Work will also be supplemented by information site equipment, time and financial plans and drawings of all the individual components specified in the Annexes. The content of my work is also a doctoral student competition entitled "Modern technologies and materials", where thoughts about the implementation superaseptických surgeries new technologies. This work will be the content of the text section of the attachments, always mentioned with the name of specialization.
Constructive technological project of reinforced concrete monolithic hall
Hubáček, Lukáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
This diploma thesis deals with the construction and technological project of the reinforced concrete monolithic hall for Dinel s.r.o., which has its seat in the industrial zone Zlín - Příluky. There are prepared a technical report for the construction project, time and financial plan of the construction of the second stage, a study of the implementation of the main technological stages, a project of the building facility, a design of the main building machines and mechanisms, a schedule of the main building including a plan of the material resources and technological regulations of selected stages together with control and test plans. In addition there is prepared a budget item of the main building, the health and safety plan and a problematics of the antistatic floors.
Implementation of the substructure of a residential building in Brno Bohunice
Hačka, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The objective of bachelor thesis is the construction technological project of the new residential building in Brno. The bachelor thesis includes technological regulations of earthwork, technological regulations of implementation foundations construction, implementation piles. Technological regulations are supplemented by draft of the suitable machinery, equipment of construction site and inspectional and trial plans. The author also deals with work safety, time work safety, time schedule and budget of substructure. The content of my work is also a Student Research and Professional Activities, which I consider the choice of the site for the realization of a residential building in two different locations with different soil bearing capacity. This work is the content of the annexes under number 19. "Student Research and Professional Activities."
Implementation of the rough substructure of the emergency building of the Faculty Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this bachelor thesis is a solution of the rough substructure of the emergency building of the Faculty Hospital Brno. The thesis deals with the technological regulation for foundation constructions, with other topics including an inspection-check plan, a time schedule and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of the construction and occupational safety and health risks. Finally this thesis contains several schemes for the implementation of individual structures and the energy performance of buildings.
Implementation of the rough substructure of the emergency building of the Faculty Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this bachelor thesis is a solution of the rough substructure of the emergency building of the Faculty Hospital Brno. The thesis deals with the technological regulation for foundation constructions, with other topics including an inspection-check plan, a time schedule and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of the construction and occupational safety and health risks. Finally this thesis contains several schemes for the implementation of individual structures and the energy performance of buildings.
Constructive technological project of reinforced concrete monolithic hall
Hubáček, Lukáš ; Kopecký, Lukáš (referee) ; Diaz, Yvetta (advisor)
This diploma thesis deals with the construction and technological project of the reinforced concrete monolithic hall for Dinel s.r.o., which has its seat in the industrial zone Zlín - Příluky. There are prepared a technical report for the construction project, time and financial plan of the construction of the second stage, a study of the implementation of the main technological stages, a project of the building facility, a design of the main building machines and mechanisms, a schedule of the main building including a plan of the material resources and technological regulations of selected stages together with control and test plans. In addition there is prepared a budget item of the main building, the health and safety plan and a problematics of the antistatic floors.
Architectural and technological project of reconstruction surgeries KPRCH University Hospital Brno
Hačka, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this work is to prepare the implementation of the reconstruction and extension of the Teaching hospital Brno Bohunice. Implementation of major technological stages is addressed in building technological study. Work includes selected legal procedures before the start of construction work, such as opening the envelopes and investor-supplier contract for the work. Further work solution contains selected technological processes of each sub-job phases, complemented by technological regulations, proposals for major construction machinery, selected inspection and test plans. As part of my work I will work with subcontractors to perform CFA piles, so I deal with on demand system for subcontractors, notice of award, issuing orders and delivery site for subcontractors. I believe that the subject of occupational health and safety on the jobsite is an important chapter construction and will therefore address the safety and health of people at work drawing up a plan OHS and OHS coordination meetings. Work will also be supplemented by information site equipment, time and financial plans and drawings of all the individual components specified in the Annexes. The content of my work is also a doctoral student competition entitled "Modern technologies and materials", where thoughts about the implementation superaseptických surgeries new technologies. This work will be the content of the text section of the attachments, always mentioned with the name of specialization.
Implementation of the substructure of a residential building in Brno Bohunice
Hačka, Martin ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The objective of bachelor thesis is the construction technological project of the new residential building in Brno. The bachelor thesis includes technological regulations of earthwork, technological regulations of implementation foundations construction, implementation piles. Technological regulations are supplemented by draft of the suitable machinery, equipment of construction site and inspectional and trial plans. The author also deals with work safety, time work safety, time schedule and budget of substructure. The content of my work is also a Student Research and Professional Activities, which I consider the choice of the site for the realization of a residential building in two different locations with different soil bearing capacity. This work is the content of the annexes under number 19. "Student Research and Professional Activities."

Interested in being notified about new results for this query?
Subscribe to the RSS feed.