National Repository of Grey Literature 5 records found  Search took 0.01 seconds. 
Construction-technological project of housing estate Nové Medlánky, section F
Hynek, Jiří ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
The master´s thesis deals with the constructive-technological project of dwelling house. The project includes a technical report, an operating regulativ of substructure carcassing of a main building object, time and financial schedule, building site, quality and safety requirement. The work is based on the project for implementation.
Highway bridge at Soběslav - preparation, implementation and project management
Topinka, Jiří ; Špinar, Petr (referee) ; Hrazdil, Václav (advisor)
Master´s thesis processes Construction technology project and implementation of bridge at Soběslav on the route D3, section D3 Tábor – Veselí nad Lužnicí, concretely SO 7-216 Bridge over the route III/15527, Černovický stream and biocorridor km 94,100. This is a permanent road bridge about 25 fields with the continuous construction of precast prestressed concrete beams longitudinally coupled concrete slab.
Highway bridge at Soběslav - preparation, implementation and project management
Topinka, Jiří ; Špinar, Petr (referee) ; Hrazdil, Václav (advisor)
Master´s thesis processes Construction technology project and implementation of bridge at Soběslav on the route D3, section D3 Tábor – Veselí nad Lužnicí, concretely SO 7-216 Bridge over the route III/15527, Černovický stream and biocorridor km 94,100. This is a permanent road bridge about 25 fields with the continuous construction of precast prestressed concrete beams longitudinally coupled concrete slab.
Construction-technological project of housing estate Nové Medlánky, section F
Hynek, Jiří ; Mohapl,, Martin (referee) ; Šlanhof, Jiří (advisor)
The master´s thesis deals with the constructive-technological project of dwelling house. The project includes a technical report, an operating regulativ of substructure carcassing of a main building object, time and financial schedule, building site, quality and safety requirement. The work is based on the project for implementation.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.