The use of HEC-RAS software for determination of channel capacity downstream of the dam
Pavlíček, Michal ; Duchan, David (referee) ; Špano, Miroslav (advisor)
The Bachelor’s Thesis is focused on a computation of water levels in the open channel reach which is situated beneath the Bawanur Dam. The thesis also includes computation of rating curves of bottom outlet, spillway with tainter gates and hydro-power plant of the dam. Solution was pursued by using one – dimensional model of nonuniform steady flow created in HEC – RAS software. The capacity of the channel reach and the capacity of the dam is a result of computation.
Reconstruction of dam Ivanské jezero
Svatoš, Petr ; Beran, Ivan (referee) ; Duchan, David (advisor)
Water structure Ivanské jezero was built on the Javorník Creek back between 1905-1907. The main purpose of the dam was accumulation of high volumes of water and protection of the territory downstream. After the adjustment for higher flows on the river Kněžna in Rychnov nad Kněžnou, which was completed in 1937, the water structure lost the protective function. On the basis of an assessment made by Povodí Labe in 1993 - due to the low volume of the reservoir there is no flood wave transformation and already while flow rates greater than Q50 pass through dam, it results in overflowing the dam. To this date water structure Ivanské jezero is in very poor condition due to degradation of the binding material in the dam. The goal of the thesis is to propose a procedure for removal of the existing structure and the subsequent construction of the design and construction of a new – gravity, concrete dam. This work will contain technological removal process of current dam and possible usage options for the dam material. In the next step a new structure will be designed in the place of existing dam. After new design is completed there will be hydraulic assessment of the functional objects, hydrology and stability on the dam.
Reconstruction of dam Ivanské jezero
Svatoš, Petr ; Beran, Ivan (referee) ; Duchan, David (advisor)
Water structure Ivanské jezero was built on the Javorník Creek back between 1905-1907. The main purpose of the dam was accumulation of high volumes of water and protection of the territory downstream. After the adjustment for higher flows on the river Kněžna in Rychnov nad Kněžnou, which was completed in 1937, the water structure lost the protective function. On the basis of an assessment made by Povodí Labe in 1993 - due to the low volume of the reservoir there is no flood wave transformation and already while flow rates greater than Q50 pass through dam, it results in overflowing the dam. To this date water structure Ivanské jezero is in very poor condition due to degradation of the binding material in the dam. The goal of the thesis is to propose a procedure for removal of the existing structure and the subsequent construction of the design and construction of a new – gravity, concrete dam. This work will contain technological removal process of current dam and possible usage options for the dam material. In the next step a new structure will be designed in the place of existing dam. After new design is completed there will be hydraulic assessment of the functional objects, hydrology and stability on the dam.
The use of HEC-RAS software for determination of channel capacity downstream of the dam
Pavlíček, Michal ; Duchan, David (referee) ; Špano, Miroslav (advisor)
The Bachelor’s Thesis is focused on a computation of water levels in the open channel reach which is situated beneath the Bawanur Dam. The thesis also includes computation of rating curves of bottom outlet, spillway with tainter gates and hydro-power plant of the dam. Solution was pursued by using one – dimensional model of nonuniform steady flow created in HEC – RAS software. The capacity of the channel reach and the capacity of the dam is a result of computation.