National Repository of Grey Literature 5 records found  Search took 0.01 seconds. 
Vysoké Mýto - connection to motorway R35, phase of construction
Novák, Martin ; Netolický, Stanislav (referee) ; Holcner, Petr (advisor)
The thesis deals with the stages of development of Vysoke Myto road network with an emphasis to design an optional diversion of the traffic from the town itself even before the planned R35 is finished. The designed solution, including road connections to the present and future network, is to be functional, utilizable and economically desireable in all the stages of development.
Transport network for Brno Exhibition Centre and Brno City RingRoad
Josiek, David ; Holcner, Petr (referee) ; Všetečka, Martin (advisor)
The goal of this thesis is to design variant solution of interconnection of great city circuit and exhibition ground with secured safety of traffic without local area accesibility sacrification.
Grade-separated junction D1/R1 Ivachnová west, SVK - study
Herzog, Martin ; Lazar, Zbyněk (referee) ; Radimský, Michal (advisor)
The subject of the master's thesis is the development of a technical study of the grade-separated junction of the planned R1 expressway and the under-construction D1 highway in the section between the towns of Ružomberok and Ivachnová in Slovakia. Three variants of a possible solution were proposed and one of them was chosen that meets all the criteria.
Transport network for Brno Exhibition Centre and Brno City RingRoad
Josiek, David ; Holcner, Petr (referee) ; Všetečka, Martin (advisor)
The goal of this thesis is to design variant solution of interconnection of great city circuit and exhibition ground with secured safety of traffic without local area accesibility sacrification.
Vysoké Mýto - connection to motorway R35, phase of construction
Novák, Martin ; Netolický, Stanislav (referee) ; Holcner, Petr (advisor)
The thesis deals with the stages of development of Vysoke Myto road network with an emphasis to design an optional diversion of the traffic from the town itself even before the planned R35 is finished. The designed solution, including road connections to the present and future network, is to be functional, utilizable and economically desireable in all the stages of development.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.