National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology
Kobielusz, Petr ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.
The Blanka tunnel, geological hazadrs and problems during boring
Sedláček, Václav ; Král, Jan (advisor) ; Lešner, Jeroným (referee)
The Blanka tunnel has two boring sections: Brusnice tunnel and Královská obora tunnel. Both tunnels were boring in difficult geologycal conditions, but the geology conditions of these tunnels are not same. Also they had not the same hazards during boring. There was used a spectrum of different technical works with hazard reduction purpose and safety process of boring. There were three serious accidents, wnich everyone made a creater on the surface, but they have not the same causes. This text has a task to describe a geological survey before and during the boring of both tunnels. How other reasons affected the process of boring? How the tunnels were bored? What events preceded the everyone of three major failure? This text does not deal with economical things of boring and effects of specific personal influence on the process of boring. Key words Tunnel, excavation, Blanka, Brusnice, Letná, Stromovka park, Vltava river, underground water, geology, ordovik, New Austrian Tunnelling method, pilot tunnel, calotte, bench, bottom, arche, bolt, lining, grouting, collapse of ceiling, failure, tube, shale, quarzite, soil, loess, ballast, clay
An expert assessment of the construction conditions during the excavation of královopolský tunnel
Kostka, Rostislav
As a result of the excavation of Královopolský tunnel, situated under Dobrovského and Veleslavínova streets in Brno, some depressions and inclinations of existing buildings have happened. In the article we are dealing with the time flow of deformations on representative buildings and the process of long-term registering of cracks in the time-dependency. The malfunctions were monitored after the excavation of check tunnels in the 2001 – 2006 period and again during the excavation in 2006 – 2007; they are monitored till nowadays. The monitoring records have been entered into the tables in the time-dependency and these dependencies were graphically presented. On the basis of 'Static ensuring of the existing surface building' project documentation the static ensuring was projected and lastly implemented in most of the objects.
City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology
Kobielusz, Petr ; Mohapl, Martin (referee) ; Šlanhof, Jiří (advisor)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.