National Repository of Grey Literature 8 records found  Search took 0.00 seconds. 
Ball screws for the feed system with long stroke
Nováček, Milan ; Novotný, Lubomír (referee) ; Marek, Jiří (advisor)
Master´s thesis is directed for long ball screws of nut. It is here wrote their principle, essential type, parameters and current status of single used components. For this thesis is created at program Microsoft Excel methodical calculating of required parameters ball screws of nut. Another they are investigated status of affect length shaft ball screws, as mode storage, type actuator and possible damping. In last part is solved the design of supports long shaft ball screws and is here proposed conceptual process used supports.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
Inspection and preliminary assessment of reinforced concrete bridge
Drbohlav, Martin ; Kocáb, Dalibor (referee) ; Cikrle, Petr (advisor)
Policies preliminary survey reinforced concrete bridge. The theoretical section contains review of standards ČSN 73 6221. In a practical section there is made an examination of a bridge object over a river Litava ( Cézava). Classification with recommended bridge repairs is carried out based on the detected defects.
Survey and Assessment of highway D2 Bridge
Výpustek, Libor ; Suza, Igor (referee) ; Cikrle, Petr (advisor)
This thesis deals with the exploration and evaluation of the existing bridge carried him on the highway D2. The work is divided into theoretical and practical parts. The theoretical part focuses on the technical surveys, diagnosis of building structures and some methods of investigation and testing of building structures. In the practical part the visual inspection and diagnosis of disorders of the highway bridge substructures ev. No. D2-058, to determine material characteristics substructure and evaluate the state of the bridge. In conclusion, the practical part of the recommendations for the design and method of repairing the bridge.
Highway multispan bridge over wide wally
Bobek, Lukáš ; Daněk, Ing Stanislav (referee) ; Klusáček, Ladislav (advisor)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
Ball screws for the feed system with long stroke
Nováček, Milan ; Novotný, Lubomír (referee) ; Marek, Jiří (advisor)
Master´s thesis is directed for long ball screws of nut. It is here wrote their principle, essential type, parameters and current status of single used components. For this thesis is created at program Microsoft Excel methodical calculating of required parameters ball screws of nut. Another they are investigated status of affect length shaft ball screws, as mode storage, type actuator and possible damping. In last part is solved the design of supports long shaft ball screws and is here proposed conceptual process used supports.
Survey and Assessment of highway D2 Bridge
Výpustek, Libor ; Suza, Igor (referee) ; Cikrle, Petr (advisor)
This thesis deals with the exploration and evaluation of the existing bridge carried him on the highway D2. The work is divided into theoretical and practical parts. The theoretical part focuses on the technical surveys, diagnosis of building structures and some methods of investigation and testing of building structures. In the practical part the visual inspection and diagnosis of disorders of the highway bridge substructures ev. No. D2-058, to determine material characteristics substructure and evaluate the state of the bridge. In conclusion, the practical part of the recommendations for the design and method of repairing the bridge.
Inspection and preliminary assessment of reinforced concrete bridge
Drbohlav, Martin ; Kocáb, Dalibor (referee) ; Cikrle, Petr (advisor)
Policies preliminary survey reinforced concrete bridge. The theoretical section contains review of standards ČSN 73 6221. In a practical section there is made an examination of a bridge object over a river Litava ( Cézava). Classification with recommended bridge repairs is carried out based on the detected defects.