National Repository of Grey Literature 12 records found  1 - 10next  jump to record: Search took 0.00 seconds. 
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.
Technological stage of realization structure of polyfunfcion building
Liška, Aleš ; Ing.Jitka Vlčková (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is technological stage of realization structure of polyfunfcion building in Velesin. The thesis deals with facility of the building site, project of machines, technological rules, plan of quality controls, timetable, item budget and work safety.
Realization of technological steps gross upper building construction of ski facilities in Kouty nad Desnou
Jandová, Renáta ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The main subject of Bachelor thesis concerns two technological phases of roughly build upper building of ski areal in Kouty nad Desnou. The building serves as a dinning and bowling centre. In particular there are three restaurants. The object is located in the centre of the village, under the ski slope. It will be used all over the year ass entertaining centre. The building has one floor bellow and two above the ground. The construction is made like monolithic core structure with Porotherm brick blocks. The individual technological phases focus on the vertical supporting constructions in second floor and monolithic ferroconcrete roof above second floor. In pursuance of second task, the thesis compares financial and time point of view of two technologies of making vertical supporting walls.
Construction Order Management in the Construction Company
Mlynár, Peter ; Bukovský, Marián (referee) ; Nováková, Jana (advisor)
This thesis deals with managing construction order in the construction company. The aim of thesis is to describe the process of preparation and execution of a construction. The theoretical part describes and explains basic concepts of project planning, then these concepts are applied to production of constructions. The practical part is based on my preparation of construction documentation on the construction project “Extension of production hall in Martin”.
The community center in the Czech Budejovice - Construction Technology Project
Vondrák, Tomáš ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.
Realization of technological steps gross upper building construction of the Technology Centre, Brno Dobrovského
Bartoněk, Vratislav ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
This Bachelor thesis is based upon the Technology Centre project of Dobrovsky tunnels in Brno, Czech Republic. The Technology Centre will be used mainly for the placement of controls of technology, controls of operation and also for operating the ventilation of tunnel‘s traffic area. The building of Technology Centre is located approximately in the middle of the tunnel‘s paths, and divided to two independent units - TCI and TCII. This work deals with the implementation of construction site TCI. It is an eight-floored object with seven floors located underground and one above the ground. This work involves the technological prescription with inspection and test plan for implementation of underground walls and performing the monolithic ceiling construction. Also a part of this work is the building equipment layout with organization of construction, the mechanical assembly blueprint, a time schedule, an itemized budget, an HSW and an environment.
Construction Order Management in the Construction Company
Mlynár, Peter ; Bukovský, Marián (referee) ; Nováková, Jana (advisor)
This thesis deals with managing construction order in the construction company. The aim of thesis is to describe the process of preparation and execution of a construction. The theoretical part describes and explains basic concepts of project planning, then these concepts are applied to production of constructions. The practical part is based on my preparation of construction documentation on the construction project “Extension of production hall in Martin”.
Technological stage of realization structure of polyfunfcion building
Liška, Aleš ; Ing.Jitka Vlčková (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is technological stage of realization structure of polyfunfcion building in Velesin. The thesis deals with facility of the building site, project of machines, technological rules, plan of quality controls, timetable, item budget and work safety.
The community center in the Czech Budejovice - Construction Technology Project
Vondrák, Tomáš ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.
Department store - Building Technology Project
Bláhová, Barbora ; Ing.Václav Čech (referee) ; Henková, Svatava (advisor)
The thesis is focused on building technology solutions for the construction department store. The front of the main entrance, designed for base personnel has two floors; the rest designed for the sale is single-storey. The building is designed as a reinforced concrete skeleton hall. Roofing is solved by a flat roof consisting of sales of reinforced concrete beams with a slope of 3 %, with the roofing sheet ALKORPLAN. The two-storey part of the roof is again dealt with a flat roof, consisting of ceiling panels and concrete catchment slope of 2 %, the roofing sheet ALKORPLAN. External walls are designed sandwich panels KINGSPAN. Walls and ceilings are dealt with plasterboard. The floors are made of linoleum and ceramic tiles. The building is equipped with aluminum windows, interior doors are made of wood. Outdoor and entrance doors are made from aluminum. This thesis addresses the implementation of technology, organization of construction, time demands, costs to implement the object, control over the implementation – KZP, coordination situation, and instructions for use of the building after its handover to the owner.

National Repository of Grey Literature : 12 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.