National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Integrated Call Centre Český Těšín, Preparation for Construction
Kovář, Jakub ; Průcha, Aleš (referee) ; Šlanhof, Jiří (advisor)
The subject of the diploma thesis is the elaboration of the construction and technological project for the new Integrované výjezdové centrum Český Těšín. In the proposed area, there will be the Fire and Rescue Service of the Moravian-Silesian Region – branch Český Těšín, Municipal Police Český Těšín, and the Police of the Czech Republic – district department and department of criminal police service and investigation. The diploma thesis is exclusively focused on the Fire and Rescue Service facility. The content of this thesis includes a technical report, a coordination situation of the construction with broader relations of traffic routes, a time and financial plan – object-oriented, a study of the implementation of the main technological stages of the construction object, a project of the construction site along with a calculation of construction site equipment costs, a proposal for the main construction machines and mechanisms, a time schedule, a plan for ensuring material resources for the rough construction, a technological specification for monolithic ceiling structures along with a drawing of ceiling formwork, a control and testing plan, and a budget for the completed building SO 01.
Preparation and Organization of Selected Construction
Poledníková, Hana ; Boháček, Adam (referee) ; Šlanhof, Jiří (advisor)
The subject of the thesis is the development of a construction technology project for the new construction of the Dukelská administrative building in the city of Brno. It is a four storey, non-basement building covered with a single-skinned surface. The content of this work is a technical report, the coordination situation of the building with wider relations of transport routes, a time and financial plan - object plan, a study of the building construction object and its main technological stages, project equipment of the workplace for three stages of construction together with the calculation of costs for construction site equipment, the proposal of the main construction machines, time schedule, plan to ensure material resources for rough construction, technological prescription for monolithic ceiling constructions together with ceiling formwork drawing, quality control and testing plan and health and safety plan. The work also includes construction calculations according to THU, the budget of the closed construction SO 01 and the economic evaluation of the use of the crane.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.