National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Design of a pump and pipeline to ensure higher safety of the nuclear power plant
Ošťádal, Michal ; Milčák, Pavel (referee) ; Pospíšil, Jiří (advisor)
The main goal of the diploma thesis is to design the hydraulic part of the new piping system, which is added to the existing project of the Dukovany Nuclear Power Plant. At the beginning of the work is theoretical basis for the design of the hydraulic part. The next part is the selection of piping material for aggressive refrigerant with subsequent verification of the pipe wall thickness. The piping system is designed with specific components from the companies SIGMA GROUP a.s., ARAKO spol. s.r.o. and ARMATURY Group a.s. In the last part, hydraulic solution is developed and commented using the excel program. The piping system is processed into the drawing documentation including bill of materials.
Sanitation installation and gas installation in an office building with a shop
Polický, Robin ; Vaščáková, Alena (referee) ; Vrána, Jakub (advisor)
Bachelor’s thesis deals with sanitation installations and gas installations. The theoretical part solves the topic of materials used for pipeline production and their use based on their properties. The calculation and project part solves the concrete design of sewerage, water pipelines and gas pipelines in the administration building and their property connections.
Design of a pump and pipeline to ensure higher safety of the nuclear power plant
Ošťádal, Michal ; Milčák, Pavel (referee) ; Pospíšil, Jiří (advisor)
The main goal of the diploma thesis is to design the hydraulic part of the new piping system, which is added to the existing project of the Dukovany Nuclear Power Plant. At the beginning of the work is theoretical basis for the design of the hydraulic part. The next part is the selection of piping material for aggressive refrigerant with subsequent verification of the pipe wall thickness. The piping system is designed with specific components from the companies SIGMA GROUP a.s., ARAKO spol. s.r.o. and ARMATURY Group a.s. In the last part, hydraulic solution is developed and commented using the excel program. The piping system is processed into the drawing documentation including bill of materials.
Sanitation installation and gas installation in an office building with a shop
Polický, Robin ; Vaščáková, Alena (referee) ; Vrána, Jakub (advisor)
Bachelor’s thesis deals with sanitation installations and gas installations. The theoretical part solves the topic of materials used for pipeline production and their use based on their properties. The calculation and project part solves the concrete design of sewerage, water pipelines and gas pipelines in the administration building and their property connections.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.