National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Heating of the Training Center
Matoulková, Jana ; Topič, Jan (referee) ; Vendlová, Lucie (advisor)
The aim of this thesis was to design heating a training center in the Velke Mezirici. The heat source was designed gas condensing boiler, which covers the requirements for the heating system and heater air handling unit with heat recovery. The heat source is located in the utility room on the first floor. The building was designed by panel radiators and convectors bench.
Reactive power compensation systems
Lakomý, Marek ; Paar, Martin (referee) ; Drápela, Jiří (advisor)
Bachelor‘s thesis deals with the compensation of reactive power, which enables improved power factor correction. The theoretical part includes an explanation of basic concepts of the theory of reactive power compensation, the basic allocation of compensating equipment, their description and basic computational relations. Simulation of compensation devices, making laboratory models and measuring their parameters were realized as the practical part of the thesis.
Reactive power compensation systems
Lakomý, Marek ; Paar, Martin (referee) ; Drápela, Jiří (advisor)
Bachelor‘s thesis deals with the compensation of reactive power, which enables improved power factor correction. The theoretical part includes an explanation of basic concepts of the theory of reactive power compensation, the basic allocation of compensating equipment, their description and basic computational relations. Simulation of compensation devices, making laboratory models and measuring their parameters were realized as the practical part of the thesis.
Heating of the Training Center
Matoulková, Jana ; Topič, Jan (referee) ; Vendlová, Lucie (advisor)
The aim of this thesis was to design heating a training center in the Velke Mezirici. The heat source was designed gas condensing boiler, which covers the requirements for the heating system and heater air handling unit with heat recovery. The heat source is located in the utility room on the first floor. The building was designed by panel radiators and convectors bench.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.