| |
| |
|
New testing method on production line
Zuhla, Michal ; Horák, Jaroslav (referee) ; Rumíšek, Pavel (advisor)
This Diploma thesis is aimed at testing centre at the assembly line for boarding steps and ramps for rail vehicles. This project describes various activities and issues associated with the testing of these products. The project also evaluates current testing processes and proposes optimal future state and recommends solutions necessary to achieve this. A new design of a testing centre is also developed.
|
|
Diesel railroad vehicles drive concepts
Polcer, Pavel ; Knotek, Jiří (referee) ; Zubík, Martin (advisor)
Thesis deals with diesel railroad vehicle drive concepts, in other words transmission of power from diesel engine to driven wheels. Currently used drives are described in terms of functionality, limitations and efficiency. Numerical model, which simulates rail vehicle journey, is used to compare efficiency of drives, or more accurately, energy needs for their operation. Based on the numerical model, suitable drives are recommended.
|
| |
| |
|
Diesel railroad vehicles drive concepts
Polcer, Pavel ; Knotek, Jiří (referee) ; Zubík, Martin (advisor)
Thesis deals with diesel railroad vehicle drive concepts, in other words transmission of power from diesel engine to driven wheels. Currently used drives are described in terms of functionality, limitations and efficiency. Numerical model, which simulates rail vehicle journey, is used to compare efficiency of drives, or more accurately, energy needs for their operation. Based on the numerical model, suitable drives are recommended.
|
|
New testing method on production line
Zuhla, Michal ; Horák, Jaroslav (referee) ; Rumíšek, Pavel (advisor)
This Diploma thesis is aimed at testing centre at the assembly line for boarding steps and ramps for rail vehicles. This project describes various activities and issues associated with the testing of these products. The project also evaluates current testing processes and proposes optimal future state and recommends solutions necessary to achieve this. A new design of a testing centre is also developed.
|
| |
| |