Design of a 25 kV traction disconnector
Buchta, Martin ; Bušov, Bohuslav (referee) ; Šimek, David (advisor)
This diploma thesis deals with the design of a traction disconnector for 25 kV AC and a rated current of 800 A. The result should be a competitive disconnector that is capable of potential applications on domestic railways and should have parameters that other local manufacturers do not currently offer. This is, for example, electrical strength or the size of the rated current, which is an economic option for most railway lines in the Czech Republic. According to the proposed drawing documentation, the disconnector was assembled and then the selected disconnector parameters were tested. For example, electrical strength tests, short-circuit tests, constant current tests, etc. were performed. The calculated and measured values were compared together. The designed disconnector was financially and technically evaluated on the basis of test results and the construction itself. Finally, some appropriate adjustments were proposed.
Design of a 25 kV traction disconnector
Buchta, Martin ; Bušov, Bohuslav (referee) ; Šimek, David (advisor)
This diploma thesis deals with the design of a traction disconnector for 25 kV AC and a rated current of 800 A. The result should be a competitive disconnector that is capable of potential applications on domestic railways and should have parameters that other local manufacturers do not currently offer. This is, for example, electrical strength or the size of the rated current, which is an economic option for most railway lines in the Czech Republic. According to the proposed drawing documentation, the disconnector was assembled and then the selected disconnector parameters were tested. For example, electrical strength tests, short-circuit tests, constant current tests, etc. were performed. The calculated and measured values were compared together. The designed disconnector was financially and technically evaluated on the basis of test results and the construction itself. Finally, some appropriate adjustments were proposed.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.