Load Flow Calculation and Design of Distance Protection Relay Settings of 110 kV Overhead Line
Jasenský, Filip ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
Bachelor thesis load flow calculation and design of distance protection relay settings of 110 kV overhead line acquaints with the theory calculation of steady operation, short-circuit conditions and a proposal setting the distance protection. The theoretical part is made an example of a simple calculation to show leadership methods of calculation. The practical part is a calculation of steady operation and short-circuit conditions. Short-circuit ratios are calculated for a single operation and parallel operation of transformers in Otrokovice. Calculated using the initial shock symmetrical output from the calculation of short-circuit conditions is verified by short circuit resistance of substations. The practical section setting the distance protection ABB REL 316*4 and compensation earth faults. Calculation of steady state and short-circuit conditions designed basic operational state of the network, for which the design of a distance protection relay settings.
Short-circuit Calculation of Local Distribution Network
Byrtus, Jiří ; Paar, Martin (referee) ; Topolánek, David (advisor)
This thesis deals with transient phenomena in the electricity grid - especially with short-circuits. First part describes short-circuit types, reasons for their commencement and also consequences of their functioning. The thesis further shows waveforms of short-circuit currents and its components. A method of calculating short-circuits currents, using the constituent systems and the basic equations for calculating short-circuit impedances are also mentioned here. Relations and methods are based on valid standards of IEC 60909 – 0. The second part indicates the calculation of two-phase and three-phase short-circuit currents for specific network of industrial building. This calculation aims to verify the dimensioning of substations for short-circuit currents after connecting a synchronous generator with given power to the main substation.
Load Flow Calculation and Design of Distance Protection Relay Settings of 110 kV Overhead Line
Jasenský, Filip ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
Bachelor thesis load flow calculation and design of distance protection relay settings of 110 kV overhead line acquaints with the theory calculation of steady operation, short-circuit conditions and a proposal setting the distance protection. The theoretical part is made an example of a simple calculation to show leadership methods of calculation. The practical part is a calculation of steady operation and short-circuit conditions. Short-circuit ratios are calculated for a single operation and parallel operation of transformers in Otrokovice. Calculated using the initial shock symmetrical output from the calculation of short-circuit conditions is verified by short circuit resistance of substations. The practical section setting the distance protection ABB REL 316*4 and compensation earth faults. Calculation of steady state and short-circuit conditions designed basic operational state of the network, for which the design of a distance protection relay settings.
Short-circuit Calculation of Local Distribution Network
Byrtus, Jiří ; Paar, Martin (referee) ; Topolánek, David (advisor)
This thesis deals with transient phenomena in the electricity grid - especially with short-circuits. First part describes short-circuit types, reasons for their commencement and also consequences of their functioning. The thesis further shows waveforms of short-circuit currents and its components. A method of calculating short-circuits currents, using the constituent systems and the basic equations for calculating short-circuit impedances are also mentioned here. Relations and methods are based on valid standards of IEC 60909 – 0. The second part indicates the calculation of two-phase and three-phase short-circuit currents for specific network of industrial building. This calculation aims to verify the dimensioning of substations for short-circuit currents after connecting a synchronous generator with given power to the main substation.