National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Railway Bridge
Jirkovská, Eva ; Straka,, Bohumil (referee) ; Buchta, Stanislav (advisor)
The thesis deals with design and static assessment of the steel railway bridge with a span 36,6 m. The bridge is located on the two-track corridor line Košice - Púchov. It consists of two bridge structures connected by a longitudinal expansion joint. The main construction consists of four solid welded beams mounted on steel calotte bearings. The bridge deck is the top with a tub for the track bed, which is continuous at the site of the bridge. Bridging the bridge is secured by a track bed and a horizontal and lateral truss bracing. On both sides of the bridge are pedestrian walkways with a width of 1,5 m.
Footbridge across river
Klíč, Radim ; Pešek, Ondřej (referee) ; Balázs, Ivan (advisor)
The diploma thesis deals with a design of a steel loadbearing structure of a footbridge over a river. The footbridge is located in Svitavy and is designed for span length of 60 meters. The construction is preliminarily designed in two variants. A part of the thesis is also a comparison of both variants. The chosen variant has been elaborated in detail. It is an arched construction with a semi-through bridge deck. The main loadbearing structure consists of a pair of arches that support the steel-concrete bridge deck by means of rods in tension. The main loadbearing arches are inclined from the vertical plane towards the bridge axis and are fixed at the ends. All steel parts are designed from S355 steel, except for the rods that are designed from S460 steel. The bridge deck is designed from C 35/45 concrete. The spatial rigidity of the structure in the transverse direction is achieved by means of arc sway bracings.
Footbridge across river
Klíč, Radim ; Pešek, Ondřej (referee) ; Balázs, Ivan (advisor)
The diploma thesis deals with a design of a steel loadbearing structure of a footbridge over a river. The footbridge is located in Svitavy and is designed for span length of 60 meters. The construction is preliminarily designed in two variants. A part of the thesis is also a comparison of both variants. The chosen variant has been elaborated in detail. It is an arched construction with a semi-through bridge deck. The main loadbearing structure consists of a pair of arches that support the steel-concrete bridge deck by means of rods in tension. The main loadbearing arches are inclined from the vertical plane towards the bridge axis and are fixed at the ends. All steel parts are designed from S355 steel, except for the rods that are designed from S460 steel. The bridge deck is designed from C 35/45 concrete. The spatial rigidity of the structure in the transverse direction is achieved by means of arc sway bracings.
Railway Bridge
Jirkovská, Eva ; Straka,, Bohumil (referee) ; Buchta, Stanislav (advisor)
The thesis deals with design and static assessment of the steel railway bridge with a span 36,6 m. The bridge is located on the two-track corridor line Košice - Púchov. It consists of two bridge structures connected by a longitudinal expansion joint. The main construction consists of four solid welded beams mounted on steel calotte bearings. The bridge deck is the top with a tub for the track bed, which is continuous at the site of the bridge. Bridging the bridge is secured by a track bed and a horizontal and lateral truss bracing. On both sides of the bridge are pedestrian walkways with a width of 1,5 m.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.