National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Design of the continues bridge structure
Škarda, Jan ; Krejčík, Vladimír (referee) ; Klusáček, Ladislav (advisor)
The subject of this master thesis is the design and analysis of bridge construction on the crossing of relocated road III/11812 over the future extension of the motorway D4. The geometrical road design of the sugested relocation is predetermined. 4 variant solutions are designed, one of which is selected for subsequent detailed solution. The selected variant is designed as a slab-girder continuous 3-span beam bridge with span lenghts 20.00, 34.50, 20.00m. The load-carrying structure is connected to pillars by notched joint and to abutment by pot bearing. Calculation of load effects was made with software Scia Engineer 18.0 and the analysis was done in cmpliance with current service and ultimate limit states standards.
Bridge on the I/44 road
Majer, David ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.
Design of the continues bridge structure
Škarda, Jan ; Krejčík, Vladimír (referee) ; Klusáček, Ladislav (advisor)
The subject of this master thesis is the design and analysis of bridge construction on the crossing of relocated road III/11812 over the future extension of the motorway D4. The geometrical road design of the sugested relocation is predetermined. 4 variant solutions are designed, one of which is selected for subsequent detailed solution. The selected variant is designed as a slab-girder continuous 3-span beam bridge with span lenghts 20.00, 34.50, 20.00m. The load-carrying structure is connected to pillars by notched joint and to abutment by pot bearing. Calculation of load effects was made with software Scia Engineer 18.0 and the analysis was done in cmpliance with current service and ultimate limit states standards.
Bridge on the I/44 road
Majer, David ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.