National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Motel
Veselský, Jaroslav ; Klimek, Karel (referee) ; Čuprová, Danuše (advisor)
The subject of this diploma thesis is designing a new building of Motel in Mikulov in Moravia. The object is located near a road in the suburbs. The land is in a sloped terrain. The object has three aboveground floors. In the first floor there is a restaurant including a kitchen and the background. There are two barier free rooms for accommodation as well. In the second floor there are eight double rooms. In the western part of the object there is a multipurpose hall including its own backgroud. In this floor there are recreation rooms to be found – a library and a children’s club. The third floor consists of eight double rooms too. Some space in this floor is used for technical purposes (air conditioning equipment). The motel‘s operational part is made of cloakrooms for stuff, technical rooms and a warehouse. The construction of this building is bricked using the Porotherm system. There is flat single vegetation roof or classical-structure roof used. The building is based on base band. The perimeter wall is insulated using contact insulation ETICS system. The drawings are processed in ArchiCAD 17.
Motel
Veselský, Jaroslav ; Klimek, Karel (referee) ; Čuprová, Danuše (advisor)
The subject of this diploma thesis is designing a new building of Motel in Mikulov in Moravia. The object is located near a road in the suburbs. The land is in a sloped terrain. The object has three aboveground floors. In the first floor there is a restaurant including a kitchen and the background. There are two barier free rooms for accommodation as well. In the second floor there are eight double rooms. In the western part of the object there is a multipurpose hall including its own backgroud. In this floor there are recreation rooms to be found – a library and a children’s club. The third floor consists of eight double rooms too. Some space in this floor is used for technical purposes (air conditioning equipment). The motel‘s operational part is made of cloakrooms for stuff, technical rooms and a warehouse. The construction of this building is bricked using the Porotherm system. There is flat single vegetation roof or classical-structure roof used. The building is based on base band. The perimeter wall is insulated using contact insulation ETICS system. The drawings are processed in ArchiCAD 17.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.