Technical background of the sports complex - construction and technological project
Havlíček, Jakub ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
This diploma thesis is dealing with a construction and technological project of the backgrounds and changing rooms of the sports centre in Velké Meziříčí. An engineering report of the construction and technological project, a suggested plan of transport routes and a time and financial plan for all the building facilities are included. With a realization study of the main technological phases, a site equipment project and a suggested list of the main construction vehicles and mechanisms is being dealt in another part of the thesis. In addition to these there is a time plan of the main construction object, an itemized budget, a time deployment of machines and workers and a plan for securing all the material resources needed. An engineering report for assembling prewalls from fair-faced concrete plus a design of a systemic formwork follow. More detailed engineering report of a Spiroll ceiling panels’ assembly is part of the inspection and test plan. Last but not least, an OSH plan for installation works with a mobile crane and a noise study can also be found in this thesis.
Technical background of the sports complex - construction and technological project
Havlíček, Jakub ; Diaz, Yvetta (referee) ; Vlčková, Jitka Laura (advisor)
This diploma thesis is dealing with a construction and technological project of the backgrounds and changing rooms of the sports centre in Velké Meziříčí. An engineering report of the construction and technological project, a suggested plan of transport routes and a time and financial plan for all the building facilities are included. With a realization study of the main technological phases, a site equipment project and a suggested list of the main construction vehicles and mechanisms is being dealt in another part of the thesis. In addition to these there is a time plan of the main construction object, an itemized budget, a time deployment of machines and workers and a plan for securing all the material resources needed. An engineering report for assembling prewalls from fair-faced concrete plus a design of a systemic formwork follow. More detailed engineering report of a Spiroll ceiling panels’ assembly is part of the inspection and test plan. Last but not least, an OSH plan for installation works with a mobile crane and a noise study can also be found in this thesis.