National Repository of Grey Literature 4 records found  Search took 0.02 seconds. 
Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno
Kozla, Dávid ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
Securing the pit in over-consolidated clay
Svobodová, Nikola ; Chalmovský, Juraj (referee) ; Miča, Lumír (advisor)
Text of an abstract. The aim of the Bachelor’s thesis is design and assessment of the supporting "hypothetical" excavation pit in Neogene Brno clay. The pit is situated near the swimming stadium Za Lužánkami, where subsoil is formed this type of soil. This area is also marked as landslide area. In the first part of the thesis evaluation of the geological and geotechnical conditions is presented. Design and evaluation of the selected supporting system (two times anchored pile wall) cross-section to fulfill the Ultimate Limit State and Serviceability Limit State is described in the third part. The computational program GEO5 Sheeting Design was used to determination of required embedded depth of the wall, number of anchors and internal forces. The assessment of the first limit state of the construction was made partly by hand and partly with the help of the software application. The determination of horizontal movements of pile wall was performed via GEO5 Sheeting Assessment. External stability was analyzed using GEO5 Stability. The last section gives description of the technological construction plan.
Construction technology project of the International Clinical Research Center of St. Anne's University Hospital Brno
Kozla, Dávid ; Brandtner, Michal (referee) ; Venkrbec, Václav (advisor)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
Securing the pit in over-consolidated clay
Svobodová, Nikola ; Chalmovský, Juraj (referee) ; Miča, Lumír (advisor)
Text of an abstract. The aim of the Bachelor’s thesis is design and assessment of the supporting "hypothetical" excavation pit in Neogene Brno clay. The pit is situated near the swimming stadium Za Lužánkami, where subsoil is formed this type of soil. This area is also marked as landslide area. In the first part of the thesis evaluation of the geological and geotechnical conditions is presented. Design and evaluation of the selected supporting system (two times anchored pile wall) cross-section to fulfill the Ultimate Limit State and Serviceability Limit State is described in the third part. The computational program GEO5 Sheeting Design was used to determination of required embedded depth of the wall, number of anchors and internal forces. The assessment of the first limit state of the construction was made partly by hand and partly with the help of the software application. The determination of horizontal movements of pile wall was performed via GEO5 Sheeting Assessment. External stability was analyzed using GEO5 Stability. The last section gives description of the technological construction plan.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.