|
Road and tram bridge
Vošček, Martin ; Štrba, Michal (referee) ; Brosch, Petr (advisor)
The subject of this Diploma Thesis is to develop different alternatives of the road and tram bridge. It is a river bridge with the length of 52,5 m. There are compared two proposals, while in the first proposal it is an arch bridge with the tension bars. The second proposal which is also finalized as the winning proposal is the truss structure. Both proposals have composite deck. The structure is designed from steel S355 and concrete C35/45. The load bearing structure is designed in accordance with applicable technical standards.
|
|
Suggestion of electric scooter
Lasák, Štěpán ; Augste, Jan (referee) ; Synek, Miloš (advisor)
The goal of this master’s thesis is a construction design of an electric kick bike with the motor builded in the axle of the rear wheel. The thesis consists of theoretical part, which is describing electric kick bikes used today and the possibility of motorization. The next part is a construction design with necessary calculations and formulas.
|
|
Road and tram bridge
Vošček, Martin ; Štrba, Michal (referee) ; Brosch, Petr (advisor)
The subject of this Diploma Thesis is to develop different alternatives of the road and tram bridge. It is a river bridge with the length of 52,5 m. There are compared two proposals, while in the first proposal it is an arch bridge with the tension bars. The second proposal which is also finalized as the winning proposal is the truss structure. Both proposals have composite deck. The structure is designed from steel S355 and concrete C35/45. The load bearing structure is designed in accordance with applicable technical standards.
|
|
Suggestion of electric scooter
Lasák, Štěpán ; Augste, Jan (referee) ; Synek, Miloš (advisor)
The goal of this master’s thesis is a construction design of an electric kick bike with the motor builded in the axle of the rear wheel. The thesis consists of theoretical part, which is describing electric kick bikes used today and the possibility of motorization. The next part is a construction design with necessary calculations and formulas.
|
| |