National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Implementation of the rough superstructure of the administrative building in Senica
Kuchta, Peter ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The objective of this bachelor thesis is the design and description of the technological stage of the construction of an administration building located in the town of Senica. The superstructure is realized using the "Porotherm" system. In the thesis there is elaborated design and building documentation for the selected stage of the construction, configuration layout of the building site including wider relations to the traffic and access roads. The thesis contains technological prescriptions for the vertical masonry and ceiling structures. Furthermore there is solved organisation of the works in the selected stage and building site equipment including requirements for infrastructure networks. The time schedule, itemized budget a proposal for the machinery for the completion of the gross structure is presented. The occupational safety and health are taken into account; there are specified quality requirements, quality control and testing plan.
Implementation of the rough superstructure of the administrative building in Senica
Kuchta, Peter ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
The objective of this bachelor thesis is the design and description of the technological stage of the construction of an administration building located in the town of Senica. The superstructure is realized using the "Porotherm" system. In the thesis there is elaborated design and building documentation for the selected stage of the construction, configuration layout of the building site including wider relations to the traffic and access roads. The thesis contains technological prescriptions for the vertical masonry and ceiling structures. Furthermore there is solved organisation of the works in the selected stage and building site equipment including requirements for infrastructure networks. The time schedule, itemized budget a proposal for the machinery for the completion of the gross structure is presented. The occupational safety and health are taken into account; there are specified quality requirements, quality control and testing plan.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.