National Repository of Grey Literature 6 records found  Search took 0.01 seconds. 
Selected Parts of the Construction Technology Project of Realization Arch Bridge
Gurgul, Roman ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
Diploma thesis deals with constructive technological preparation of bridge structure SO-201. This 86m long bridge is located in a non-built-up area of the city of Nitra in Slovakia. Bridge structure is part of project Highway R1 Nitra, západ - Selenec. Bridge is formed by a self-anchored arch structure with intervening bridge deck.The bridge superstructure is formed by steel arches filled with concrete ,steel girders and beams locked with a reinforced concrete slab.
CONSTRUCTION-TECHNOLOGY PROJECT OF BRIDGE DEMOLITION AND BRIDGE CONSTRUCTION
Hofírek, Radovan ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This diploma thesis deals with the demolition of a bridge located at the D1 motorway from Prague to Brno. The bridge no longer meets the load and width requirements of today´s standards. The thesis also deals with the construction of a new bridge, which will be expanded into D28/120 category. This expansion will allow for provisory use of the carriageways of one half of the motorway in both directions. The whole reconstruction is very time consuming that is the reason the new bridge is made of prefabricated pre-tensioned girders with a composite bridge deck. This can save time and the new bridge can be open for service in a shorter period of time.
Construction technology study the construction of the guesthouse
Patloka, Jiří ; Bravenec, Roman (referee) ; Diaz, Yvetta (advisor)
The thesis solves studies major technological stages of construction in pension Tišnov. Processed was primarily a technical report solved object, technological studies technological realization of the main stages, time and financial plan construction, the basic concept of building operation, bills of quantities, technological regulation for the implementation of prefabricated reinforced concrete ceiling construction, safety measures in the construction and machine assembly stage prefabricated reinforced concrete ceiling structure.
CONSTRUCTION-TECHNOLOGY PROJECT OF BRIDGE DEMOLITION AND BRIDGE CONSTRUCTION
Hofírek, Radovan ; Venkrbec, Václav (referee) ; Henková, Svatava (advisor)
This diploma thesis deals with the demolition of a bridge located at the D1 motorway from Prague to Brno. The bridge no longer meets the load and width requirements of today´s standards. The thesis also deals with the construction of a new bridge, which will be expanded into D28/120 category. This expansion will allow for provisory use of the carriageways of one half of the motorway in both directions. The whole reconstruction is very time consuming that is the reason the new bridge is made of prefabricated pre-tensioned girders with a composite bridge deck. This can save time and the new bridge can be open for service in a shorter period of time.
Selected Parts of the Construction Technology Project of Realization Arch Bridge
Gurgul, Roman ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
Diploma thesis deals with constructive technological preparation of bridge structure SO-201. This 86m long bridge is located in a non-built-up area of the city of Nitra in Slovakia. Bridge structure is part of project Highway R1 Nitra, západ - Selenec. Bridge is formed by a self-anchored arch structure with intervening bridge deck.The bridge superstructure is formed by steel arches filled with concrete ,steel girders and beams locked with a reinforced concrete slab.
Construction technology study the construction of the guesthouse
Patloka, Jiří ; Bravenec, Roman (referee) ; Diaz, Yvetta (advisor)
The thesis solves studies major technological stages of construction in pension Tišnov. Processed was primarily a technical report solved object, technological studies technological realization of the main stages, time and financial plan construction, the basic concept of building operation, bills of quantities, technological regulation for the implementation of prefabricated reinforced concrete ceiling construction, safety measures in the construction and machine assembly stage prefabricated reinforced concrete ceiling structure.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.