National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Application of cemented carbide tools from one supplier at the production of components in the conditions of a small engineering company.
Tysoň, Jakub ; Kalivoda, Milan (referee) ; Osička, Karel (advisor)
Through this technical message is made the optimal project of the surfacing tools for the cutting of a concrete component. All conditions for the suggestion are optimalized in the small engineering company CH.W. Service, s.r.o. A problem was solved in conjunction with this company. At elaboration of this message was resulted from the actual conditions in the workroom and the time and technical possibilities in the time of demand on production of the scheduled component.
Wumen´s Enterpreneurship - Limitation, Risks, Challenges
Vavrušková, Lucia ; Kosíková, Alexandra (referee) ; Putnová, Anna (advisor)
Master´s thesis is analyzing egual alternatives of women in term of business activities also macroeconomic indicators, which can zoom in situation on labour market. It represents acquisition for the future at the hand of specific arrangements.
Wumen´s Enterpreneurship - Limitation, Risks, Challenges
Vavrušková, Lucia ; Kosíková, Alexandra (referee) ; Putnová, Anna (advisor)
Master´s thesis is analyzing egual alternatives of women in term of business activities also macroeconomic indicators, which can zoom in situation on labour market. It represents acquisition for the future at the hand of specific arrangements.
Application of cemented carbide tools from one supplier at the production of components in the conditions of a small engineering company.
Tysoň, Jakub ; Kalivoda, Milan (referee) ; Osička, Karel (advisor)
Through this technical message is made the optimal project of the surfacing tools for the cutting of a concrete component. All conditions for the suggestion are optimalized in the small engineering company CH.W. Service, s.r.o. A problem was solved in conjunction with this company. At elaboration of this message was resulted from the actual conditions in the workroom and the time and technical possibilities in the time of demand on production of the scheduled component.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.