National Repository of Grey Literature 3 records found  Search took 0.01 seconds. 
Roof Construction implementation of Planetarium in Prostějov
Stancheva, Karina ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
The subject of the bachelor this is the realization of the roofing stage of the new planetarium in Prostějov. In this work, technological processes related to the implementation of the truss, covering works, carpentry, plumbing, welding and finishing works in the form of roof insulation and installation of the supporting structure are solved. The design of the truss is specific to the different slopes of the roof plane, including the connection of the flat roof to the cupola. The content of this work is the Technical Report, transportation of materials and transport relations next to the construction site, technological regulations for the implementation of work, Technical Report of the construction site equipment, design of the machine assembly, inspection and test plans, work safety solutions, timetable, itemized budget, and thermal technical assessment of the structure, scheme of the construction site equipment.
Implementation of Roofing of Hotel in Třebíč
Schreiber, Jiří ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this bachelor´s thesis is the emplementation of roofing of hotel in the city of Třebíč. Technological projects for realization warm flat roof and for roof terrace were made. The inspections and the test plans deal with the quality of these processes. A budget and a time schedule have been drawn up as well, there is also a plan for a set of necessary machines. In addition, the thesis includes a project of site equipment and review of broader transport relation. For the most accurate data’s was made the laying plan.
Implementation of Roofing of Hotel in Třebíč
Schreiber, Jiří ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of this bachelor´s thesis is the emplementation of roofing of hotel in the city of Třebíč. Technological projects for realization warm flat roof and for roof terrace were made. The inspections and the test plans deal with the quality of these processes. A budget and a time schedule have been drawn up as well, there is also a plan for a set of necessary machines. In addition, the thesis includes a project of site equipment and review of broader transport relation. For the most accurate data’s was made the laying plan.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.