National Repository of Grey Literature 6 records found  Search took 0.01 seconds. 
Pedestrian bridge across the river Svratka
Hlava, Martin ; Koláček, Jan (referee) ; Nečas, Radim (advisor)
The subject of the bachelor thesis is about a concept of pedestrian bridge across the river Svratka. The work includes a statical calculation of the pedestrian bridge construction of one ground, which has been chosen from three other options. This chosen alternative is formed by a prestressed concrete´s plank with parapet´s supports of a variable cut earned by outer switchable cables. The calculation of the stress influence has been made by Scia Engineer Software. The construction recognition has been accomplished manually. A process of construction´s works are not going to be treated in this work.
Footbridge over the Berounka river
Pejčoch, Karel ; Kulhavý,, Tomáš (referee) ; Koláček, Jan (advisor)
THE OBJECT OF THE MASTER THESIS IS TO DESIGN OF SUPPORTING STRUCTURE OF PEDESTRIAN BRIDGE SITUATED OVER THE RIVER OF BEROUNKA. THE THESIS CONTAINS STATIC ANALYSIS OF THE CABLE-STAYED BRIDGE WITH TWO FIELDS, WHICH WAS CALCULATED IN THREE VERSIONS .THE CHOSEN VERSION OF THE BRIDGE CONSIST OF MONOLITIC AND PRECAST CONCRETE BRIDGE DECK, WHICH IS CONSTRAINED USING PRESTRESSED CABELS AND SUPPORTED BY HANGINGS.THE CALCULATIONS OF THE LONGITUDINAL WAS PERFORMED BY COMPUTATIONAL SOFTWARE OF SCIA ENGINEERING 15.1
Cable-supported pedestrian bridge
Hlava, Martin ; Juchelková,, Pavlína (referee) ; Nečas, Radim (advisor)
The purpose of the master’s thesis is about a concept of a pedestrian bridge´s bearing construction for pedestrian endorsed wires above a highway R35. The work includes a statical construction calculation of the suspended foot bridge of six spans, which has been chosen from three options. The chosen option is built of a monolithic, pre-stressed concrete board supported by suspenders, which is made by segmental elements above the fast highway. Calculation of a longitudinal direction has been made in an ANSYS application. Assembling status and cross direction of the construction has been modelled at SCIA Engineer. The construction´s recognition has been made manually expect of several towers cross-section, where the judgement has been made at IDEA StatiCa.
Footbridge over the Berounka river
Pejčoch, Karel ; Kulhavý,, Tomáš (referee) ; Koláček, Jan (advisor)
THE OBJECT OF THE MASTER THESIS IS TO DESIGN OF SUPPORTING STRUCTURE OF PEDESTRIAN BRIDGE SITUATED OVER THE RIVER OF BEROUNKA. THE THESIS CONTAINS STATIC ANALYSIS OF THE CABLE-STAYED BRIDGE WITH TWO FIELDS, WHICH WAS CALCULATED IN THREE VERSIONS .THE CHOSEN VERSION OF THE BRIDGE CONSIST OF MONOLITIC AND PRECAST CONCRETE BRIDGE DECK, WHICH IS CONSTRAINED USING PRESTRESSED CABELS AND SUPPORTED BY HANGINGS.THE CALCULATIONS OF THE LONGITUDINAL WAS PERFORMED BY COMPUTATIONAL SOFTWARE OF SCIA ENGINEERING 15.1
Cable-supported pedestrian bridge
Hlava, Martin ; Juchelková,, Pavlína (referee) ; Nečas, Radim (advisor)
The purpose of the master’s thesis is about a concept of a pedestrian bridge´s bearing construction for pedestrian endorsed wires above a highway R35. The work includes a statical construction calculation of the suspended foot bridge of six spans, which has been chosen from three options. The chosen option is built of a monolithic, pre-stressed concrete board supported by suspenders, which is made by segmental elements above the fast highway. Calculation of a longitudinal direction has been made in an ANSYS application. Assembling status and cross direction of the construction has been modelled at SCIA Engineer. The construction´s recognition has been made manually expect of several towers cross-section, where the judgement has been made at IDEA StatiCa.
Pedestrian bridge across the river Svratka
Hlava, Martin ; Koláček, Jan (referee) ; Nečas, Radim (advisor)
The subject of the bachelor thesis is about a concept of pedestrian bridge across the river Svratka. The work includes a statical calculation of the pedestrian bridge construction of one ground, which has been chosen from three other options. This chosen alternative is formed by a prestressed concrete´s plank with parapet´s supports of a variable cut earned by outer switchable cables. The calculation of the stress influence has been made by Scia Engineer Software. The construction recognition has been accomplished manually. A process of construction´s works are not going to be treated in this work.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.