National Repository of Grey Literature 16 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Air heating in exhibition space of car showroom
Bajza, Karel ; Andrys, Petr (referee) ; Rubina, Aleš (advisor)
This bachelor´s thesis deals with the designing of air conditioning system for exhibition space of car showroom and spaces which are necessary for assuring of operation. The equipment is designed to meet the operational, functional and hygienic requirements for the internal microclimate. The main task of the device's coverage of heat loss in winter and heat gains during the summer and transportation of fresh air to the interior. The theoretical part deals with cooling in air conditioning. Calculation and project part contains three desings air-conditioning units to operate various parts of car showroom. The result of this work is the detailed design work of these equipments.
Airconditioning in the clean space
Faltys, Michal ; Ell, Jiří (referee) ; Rubina, Aleš (advisor)
The bachelor´s thesis deals with the designing of air conditioning system for clean spaces of operating rooms and spaces which are necessary for assuring of operation these operating rooms. The system is proposed to meet hygienic, operational and functional requirements for indoor microclimate of clean spaces. The task of this system is the transport of fresh air to interior, the covering of the heat looses during the winter and the covering of heat gains in summer. The equipment is also designed for regulation of air humidity in the interior. The theoretical part devotes to the issue of air conditioning of clean spaces generally, calculating and project´s parts devote of the concrete concept of two air conditioning equipments for the serving of clean spaces in the specified building. The result of this work is the detailed design work of these equipments.
Airconditioning in hospital
Minář, David ; Ell, Jiří (referee) ; Rubina, Aleš (advisor)
This bachelor thesis is focused on a proposal of air conditioning for clean spaces and their hinterlands, as well as for the hinterlands of laboratories, operating rooms, waiting rooms and X-rays. The devices are designed according to hygienic, operational and functional requirements of microclimates of buildings. The theoretical part deals with the issue of heat recovery systems. The calculation and the proposal part consist of three air conditioning devices for hot air heating and air conditioning of clean spaces and warm air ventilation of hinterlands of operating rooms, waiting rooms, X-rays, etc. The result of the thesis is detailed design of these devices.
Airconditioning for hospital facility
Odehnal, Michal ; Blasinski, Petr (referee) ; Rubinová, Olga (advisor)
Bachelor´s thesis describes a design of a ventilation system for hospital facility. In this thesis first ground floor and basement designed and implemented. The system is proposed to meet hygienic, operational and functional requirements for indoor microclimate of clean spaces. The task of ventilation system is the transport of fresh air to interior, the covering of the heat looses during the winter and the covering of heat gains in the summer. The system is also designed for regulation of air humidity. Theory part of dissertation deals with clean spaces with specialization on medical facilities.
Airconditioning of production and storage hall
Fridrich, Lukáš ; Ell, Jiří (referee) ; Rubina, Aleš (advisor)
The bachelor thesis deals with the design of air conditioning equipment for production and storage hall and the space necessary to ensure the operation. The first system is designed to be able to cover the thermal load operated rooms in summer and hot air ventilation in winter time. The second system is used to hot-air heating in winter time and cover the thermal load in the summer. The third system provides coverage of thermal load in the preparation room. The theoretical part focuses on the rooftop units.
Airconditioning of the house
Milatová, Adriána ; Blasinski, Petr (referee) ; Rubina, Aleš (advisor)
The bachelor's thesis deals with the design of airconditioning devices in specific sections of the house with the swimming pool. The individual devices are designed to meet the hygienic, operational and functional requirements as demanded by the indoor microclimate of the premises. The device number 1 ensures the indoor air circulation. Coverage of heat rise in summer is ensured by the multi – split system. The device number 2 ensures moisture remove and coverage of heat loss in winter. The theoretical part of the thesis focuses on the moisture microclimate of buildings. The practical part comprises the specific proposal of two airconditioning devices for hot-air ventilation and heating of the house. The result of the thesis is the project dokumentation of two airconditioning devices of the object.
Design of air heating system
Nagorskyi, Bogdan ; Baláš, Marek (referee) ; Kracík, Petr (advisor)
This bachelor thesis describes potential possibilities to substitute hot-water radiators with hot-air units with controlled air supply. Introduction part of the thesis describes basic thermal comfort factors. Subsequently, their application in traditional heating systems was performed. After that the issue of conditional heating efficiency of the original heating systems with the simultaneous application of ventilation was discussed, the analysis of which was the reason for the suitability of designing a new system of warm air heating with controlled air supply. The design of the hot-air heating system was performed for the living room of a typical panel apartment unit. During designing a new installation, the emphasis was put primarily on eliminating the main drawbacks of the hot-air heating system, namely the height distribution of the temperature layers. The system was designed in accordance with hygiene standards and its components include other air treatment elements. In the economic evaluation of the project, calculations of the possible implementation of the hot-air system and comparison with similar products commonly available on the market were made.
Heating of the Manufacturing Hall with the administration
Březina, Jan ; Formánek, Marian (referee) ; Vendlová, Lucie (advisor)
The purpose of this bachelor thesis is to compare different heating systems for industrial buildings and to find suitable solution for the heating system of the manufacturing building located on Brno periphery. The manufacturing area consists of two one-floor manufacturing halls and three-floors administrative building. The building heating is ensured conventionally, forced ventilation is only in manufacturing halls. The heat source is gas condensing boiler located together with air-conditioning unit in technical room. The heating system is designed with accent to smooth and effective functionality.
Design of air heating system
Nagorskyi, Bogdan ; Baláš, Marek (referee) ; Kracík, Petr (advisor)
This bachelor thesis describes potential possibilities to substitute hot-water radiators with hot-air units with controlled air supply. Introduction part of the thesis describes basic thermal comfort factors. Subsequently, their application in traditional heating systems was performed. After that the issue of conditional heating efficiency of the original heating systems with the simultaneous application of ventilation was discussed, the analysis of which was the reason for the suitability of designing a new system of warm air heating with controlled air supply. The design of the hot-air heating system was performed for the living room of a typical panel apartment unit. During designing a new installation, the emphasis was put primarily on eliminating the main drawbacks of the hot-air heating system, namely the height distribution of the temperature layers. The system was designed in accordance with hygiene standards and its components include other air treatment elements. In the economic evaluation of the project, calculations of the possible implementation of the hot-air system and comparison with similar products commonly available on the market were made.
Airconditioning of the house
Milatová, Adriána ; Blasinski, Petr (referee) ; Rubina, Aleš (advisor)
The bachelor's thesis deals with the design of airconditioning devices in specific sections of the house with the swimming pool. The individual devices are designed to meet the hygienic, operational and functional requirements as demanded by the indoor microclimate of the premises. The device number 1 ensures the indoor air circulation. Coverage of heat rise in summer is ensured by the multi – split system. The device number 2 ensures moisture remove and coverage of heat loss in winter. The theoretical part of the thesis focuses on the moisture microclimate of buildings. The practical part comprises the specific proposal of two airconditioning devices for hot-air ventilation and heating of the house. The result of the thesis is the project dokumentation of two airconditioning devices of the object.

National Repository of Grey Literature : 16 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.