National Repository of Grey Literature 4 records found  Search took 0.01 seconds. 
Gmont Cable Brno
Hudečková, Simona ; Mikeš, Stanislav (referee) ; Nový, Alois (advisor)
The aim of the bachelor's thesis was the creation of individual parts of the project documentation – Documentation for Building Permits and Documentation for Building Construction. The project documentation was processed on the basis of the architectural study designed in subject AG035. The task of the bachelor's thesis was to design the G-mont Cable industrial factory, where cables will be manufactured. The area is located in the Brno-Slatina district. It extends over the Černovické terraces, it is the largest industrial zone in the Czech Republic. Currently, the land is registered as a brownfield of the former Roučka foundry. It is part of the Černovice terraces, the largest industrial zone in the Czech Republic. Currently, the land is registered as a brownfield of the former Roučka foundry. An important aspect in the design of the industrial factory was the connection of the current communication for supply to the new communication leading to the industrial hall and the appropriate orientation of the buildings to the cardinal points. The construction will be divided into an administrative part and an industrial part. These two parts will be connected by checkrooms for employees. All objects will be roofed by shading sunshades, which will optically connect the individual parts of the buildings into one building. The administrative part will consist of two two-storey buildings at different heights. There will be columns around both buildings, which will be covered with shading sunshades. The connecting building with the industrial hall will have only one floor and a terrace for employees will be available in front of it. The industrial part will consist of three halls at the same height as the administration. There will be a road around the industrial section serving freight traffic.
G-mont Cable Brno
Jussupov, Daniyar ; Suchánek,, Petr (referee) ; Nový, Alois (advisor) ; Čupr, Karel (advisor)
The aim of the bachelor thesis was the creation of individual stages of the project documentation - Documentation for Building Permits and Documentation for building construction based on the study, elaborated in subject AG35. The subject of the bachelor's thesis is a new building of the G-mont Cable plant for cable production on the street Těžební, in the Brno-Černovice district. The building's inspiration is typically a black-color cable that has been assembled with a cable of different colors: red, blue, green, yellow. The building is divided into three units -production, administration and social facilities, but the building looks like a whole. For the facade, the black color sheet ks1000 is used. Throughout the construction there are colored lines, in the production part are windows, in the administrative part only plastic glass on the facade. The building has a dynamic shape with sloping lines on the facades. In the administrative part there is a large roof skylight. The light coming into the main production penetrates through the saw blades facing north. Scattered light is not aggressive and does not interfere in any time of day.
Gmont Cable Brno
Hudečková, Simona ; Mikeš, Stanislav (referee) ; Nový, Alois (advisor)
The aim of the bachelor's thesis was the creation of individual parts of the project documentation – Documentation for Building Permits and Documentation for Building Construction. The project documentation was processed on the basis of the architectural study designed in subject AG035. The task of the bachelor's thesis was to design the G-mont Cable industrial factory, where cables will be manufactured. The area is located in the Brno-Slatina district. It extends over the Černovické terraces, it is the largest industrial zone in the Czech Republic. Currently, the land is registered as a brownfield of the former Roučka foundry. It is part of the Černovice terraces, the largest industrial zone in the Czech Republic. Currently, the land is registered as a brownfield of the former Roučka foundry. An important aspect in the design of the industrial factory was the connection of the current communication for supply to the new communication leading to the industrial hall and the appropriate orientation of the buildings to the cardinal points. The construction will be divided into an administrative part and an industrial part. These two parts will be connected by checkrooms for employees. All objects will be roofed by shading sunshades, which will optically connect the individual parts of the buildings into one building. The administrative part will consist of two two-storey buildings at different heights. There will be columns around both buildings, which will be covered with shading sunshades. The connecting building with the industrial hall will have only one floor and a terrace for employees will be available in front of it. The industrial part will consist of three halls at the same height as the administration. There will be a road around the industrial section serving freight traffic.
G-mont Cable Brno
Jussupov, Daniyar ; Suchánek,, Petr (referee) ; Nový, Alois (advisor) ; Čupr, Karel (advisor)
The aim of the bachelor thesis was the creation of individual stages of the project documentation - Documentation for Building Permits and Documentation for building construction based on the study, elaborated in subject AG35. The subject of the bachelor's thesis is a new building of the G-mont Cable plant for cable production on the street Těžební, in the Brno-Černovice district. The building's inspiration is typically a black-color cable that has been assembled with a cable of different colors: red, blue, green, yellow. The building is divided into three units -production, administration and social facilities, but the building looks like a whole. For the facade, the black color sheet ks1000 is used. Throughout the construction there are colored lines, in the production part are windows, in the administrative part only plastic glass on the facade. The building has a dynamic shape with sloping lines on the facades. In the administrative part there is a large roof skylight. The light coming into the main production penetrates through the saw blades facing north. Scattered light is not aggressive and does not interfere in any time of day.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.