National Repository of Grey Literature 297 records found  beginprevious21 - 30nextend  jump to record: Search took 0.00 seconds. 
Building Construction Project for Industrial and Administrative Building ATX
Šrámek, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of this master’s thesis is a solution of chosen parts of building construction project. The project solves industrial hall that contains productions and administrative space. This thesis includes technological regulations for substructure, study of performing the main technological stages, design of using machines, checking and testing plans. Other phrases parts are time schedules, budget, calculations, design of site equipment including engineering report and report for performing access road. Starting materials, which were used for this thesis, were engineering report also including working drawings.
Construction technology study stage of realization vegetation roof of residential house Avidol in Bratislava
Huková, Martina ; Nečasová, Barbora (referee) ; Diaz, Yvetta (advisor)
The bachelor thesis solves the building technology solution of the vegetation roof, which creates a green atrium and a relaxation zone in the residential complex Avidol in Bratislava. The subject of the bachelor thesis is the realization of a flat vegetation roof. The work includes a engineering report, budget, bill of quantities, time schedule, technical prescription, machine design, check and test plan, and other attachments by input..
The technological stage superstructure of the object of theatre in Ždírec nad Doubravou
Sokol, David ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The content of this work is the construction of the theater in Ždírec nad Doubravou, concrete implementation of carcass superstructure. This tesis contains construction, technology report, solving traffic routes, bill of quantities, technological prescription, technological report of site equipment, schedule, machinery, inspection and test plans, technological report of health and safety on the construction site.
Construction-technological Project of the Polyfunctional complex Rudiny II. - Žilina, Blok D building
Papučík, Lukáš ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of the thesis is to solve selected parts of the construction technology project for the building of the multifunctional complex Rudiny II, Žilina - building block D. The content of the thesis is a technical report to the construction technology project, studies of the implementation of the main technological stages of the building. technological regulation for horizontal and vertical monolithic structures, quality control and testing plan for the production of vertical and horizontal monolithic structures, OSH plan. In the appendix of my diploma thesis I processed drawings of construction equipment, itemized budget of the building, object budget according to THU, time plan of construction, dimensions of construction machines, laying plan for system formwork on standardized floor of multifunctional house.
Newly-built multipurpose building in Boskovice, execution of superstructure.
Sojka, Petr ; Nečasová, Barbora (referee) ; Kovářová, Barbora (advisor)
The theme of my bachelor thesis is processing technology of rough superstructure of new multi-building owned by Lamex. This is partly double-deck building consisting of storage, administrative and retail space. The subject of my work is processing technology prescription for construction of precast concrete frame and construction of steel fibre reinforced concrete floor. The other parts of this thesis, which with focused on rough superstructure are technical report, construction plan, budget with statement of merit, time schedule, wokers‘ balance, site equipment, safety of workers.
Implementation of Apartment House in Brno - Building Contruction Project
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice
Ráb, Jakub ; Diaz, Yvetta (referee) ; Nečasová, Barbora (advisor)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Construction technological project of the production and storage hall in Vlkoš u Kyjova
Prokop, Petr ; Nečasová, Barbora (referee) ; Venkrbec, Václav (advisor)
The aim of this diploma thesis is to create a construction-technological project of the production and storage hall Ahorn CZ, s.r.o. As part of this work, technical report, study of the implementation of the main technological stages, project of the construction site equipment, time and financial plan of the construction, design of the main construction machines and mechanisms, item budget and time schedule were prepared. Further the thesis contains two technological regulations and two control and test plans.
Implementation of Registred Office of Company POLNA corp. s.r.o. in Třinec
Špilínek, Richard ; Venkrbec, Václav (referee) ; Nečasová, Barbora (advisor)
This master´s thesis deals with construction-technological project of administrative-production and storage complex in Třinec - Oldřichovice. It´s a new building of the main building, consisting of a two-storey administrative building and a one-storey storage hall, which is complemented by other sub-objects. The master´s thesis solves the realization of the building as a complex whole and in more detail focuses on vertical and horizontal supporting structures, made of steel elements and steel-concrete ceiling structure. An integral part of the project include studies of the realization of the main technological stages of the main building, technological regulations, complemented by assembly schemes, solution of transport routes and proposal of machine assemblies, site equipment design, time schedules, budgets, inspection and test plans and proposal of security measures for selected risks. The work is further supplemented by a specialized area that prepares the design and execution of intra-areal reinforced communications.

National Repository of Grey Literature : 297 records found   beginprevious21 - 30nextend  jump to record:
See also: similar author names
1 Nečasová, Berenika
Interested in being notified about new results for this query?
Subscribe to the RSS feed.