National Repository of Grey Literature 421 records found  previous11 - 20nextend  jump to record: Search took 0.01 seconds. 
Implementation of Apartment House in Brno - Building Contruction Project
Pospíšil, Dominik ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Implementation of Subtructure of family house in Třebíč - Nové Město
Bobek, Vojtěch ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
This bachelor thesis focuses on a technological phase of laying foundations of a detached house using drilled micropiles. The foundation features in the given location are complicated because of thick layer of construction debris. The condition of sufficient load-bearing capacity of subsoil is fulfilled first by the deeper maternal rock. The main aims of the thesis are to prepare technological procedure for earthworks and for application of micropiles, to solve construction logistics, to plan financial and time aspects, to propose machinery, to inspect quality of building process and finally to guarantee safety while working.
Constructionally Technolological Solution of Steel Skeleton of Production Hall Hutira in Brno
Roubíček, Marek ; Liška, Pavel (referee) ; Mohapl, Martin (advisor)
This Bachelor thesis deals with constructionally technolological project of steel skeleton of production hall Hutira in Brno. The thesis solves technology prescription of steel skeleton construction, budget, time plan, equipment of construction site and inspecion and test plan.
Residential house Mutěnice, implementation of roof cladding
Dohnálek, Marek ; Liška, Pavel (referee) ; Kovářová, Barbora (advisor)
The thesis is focused on building technology solutions of the roof of a residential building in Mutěnice. It includes technical report, technological regulation, monitoring and test plan, the project of the construction site facilities, machine set, budget, time frame of the construction and occupational safety.
Implementation of Building Construction Phase - Extension of Apartment Building in Luhačovice
Holba, Petr ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of bachelor thesis is a realization of extension of the apartment building. This apartment building is located in Luhačovice. The thesis deals with the solution to technological processes of roof trust´s realization with several dormers and roof windows. The thesis also deals with realization of roofing and plumbing work. This thesis contains engeneering report, site equipment, technological regulations, machine set, time schedule of work, budget, control and test plans, construction schemes of roofing.
Residential Building in Humpolec – Execution of Superstructure
Januška, Marek ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The goal of this bachelor thesis is the processing of the building-technological project for Implementation os Superstructure of Residetial building in Humpolec. For the realization of the stage was elaborated a technological note for proces of vertical and forizontal carrying construction. Horizontal elements are made of masonry system Porotherm and concrete columns. Horizontal floors are made of concrete. Thesis also contains budget, time schedule, machine assembly, organization of construction proces. In traffic part, roads was planned from the suppliers to the place of construction.
Alternative Solution of Roofing of Residential Building in Brno
Kučerová, Petra ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
Presented bachelor thesis deals with a solution of technological phase concerning roofing of a residential building in Brno. The thesis includes accompanying report and summary technical report, technological regulations focused on mentioned technological phase, proposal of general construction machines, mechanisms and tools. Moreover the thesis includes chapters as technical report of transport solutions, health and safety plan, quality control plan, environment and health plan, budget as well as time plan (construction schedule) of a relevant technological phase. Part of the thesis is focused on an alternative solutions of roofing and their comparison with respect to finances and activity duration.
Implementation of Superstructure of Apartment Building in Čierna Voda - Chorvátský Grob
Raučinová, Veronika ; Nečasová, Barbora (referee) ; Liška, Pavel (advisor)
The aim of the bachelor thesis is to process a technological project for the technological stage of the shell construction of an apartment building in the town of Chorvátsky Grob in the local part of Čierna Voda. The construction system of the apartment building is wall-mounted, made of Porotherm blocks. Ceiling structures are monolithic reinforced concrete slabs. The content of this work is the elaboration of technological regulation for vertical load-bearing and horizontal load-bearing structures, technical report of construction-technological project, time schedule of construction of assigned technological stage, situation of construction site with wider transport relations, construction organization including drawing of construction site equipment, budget for gross construction, control and test plan. Furthermore, the work deals with traffic routes to the construction site, safety and health protection at work, design of machine assembly and comparison of variants of the horizontal load-bearing structure.
CONSTRUCTION OF A DEPARTMENT STORE IN MLADÁ BOLESAV - SOLUTION OF GROSS SUBSTRUCTURE
Škopík, Michal ; Liška, Pavel (referee) ; Novotný, Michal (advisor)
This bachelor's thesis deals with solution of gross substructure a department store in Mladá Boleslav. In this thesis is solved a technological specification for implementation of earthworks and implementation of foundations and vertical supporting constructions of gross substructure. More specifically deals with traffic situation around building, time schedule of works, proposal of machine assemblies, ensuring qualitative requirements, safety at work and budget. This thesis is very interesting about solution of construction organization, because this construction is in the middle of housing estate. The basis for this thesis was a drawing documentation for realization of this construction.

National Repository of Grey Literature : 421 records found   previous11 - 20nextend  jump to record:
See also: similar author names
5 LIŠKA, Pavel
17 LIŠKA, Petr
5 Liška, Pavel
17 Liška, Petr
17 Líska, Petr
Interested in being notified about new results for this query?
Subscribe to the RSS feed.