National Repository of Grey Literature 5 records found  Search took 0.00 seconds. 
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Warehouse in Červený Kostelec - Execution of Substructure
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of my bachelor thesis are selected chapters of the construction-technological project of the substructure of a storage hall together with the retaining walls including the main landscaping. The construction is a newly built storage hall with administratively technical and social built-in structure. The built-in has two aboveground floors. It is situated in Lhota za Červeným Kostelcem in Královéhradecký region. The bachelor thesis deals with the realization of the ground works, partially of the foundations and the retaining walls and their technology, realization, costly justify and time consuming. The part of the project is the Concomitant and Summary technical report focusing for selected stages and follow up to technological regulations, solutions of the construction site equipment, a draft of a mechanical assembly, a timetable, an itemized budget including bill of quantities, the inspection and test plan and a safety and a health protection at work.
Construction Project for Implementation of Industrial Hall for Automotive Industry
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
This diploma thesis deals with construction technology project of a newly-built automotive industrial hall on the complex Hauk – Police nad Metují. The aim of the main construction object is to build a double aisle steel hall for industrial purposes including maisonette built-in which will become social and technical facility for prospective workers. The main construction facility is complemented by secondary structures, creating functional complex for required purposes. The thesis is focused on implementation of the main load-bearing prefabricated steel structure and cladding made of selected system. An integral part of the thesis include main technology phases realization study of the main construction object, a technological prescription filled-in with assembly drawings, a design of machine assembly including dealing with its transportation, a site equipment project, time schedules, a budget, a test and inspection plan and a security measures design for selected risks. The thesis is suplemented by a specialized section dealing with the heating of reinforced landscaping.
Warehouse in Červený Kostelec - Execution of Substructure
Světlík, Jiří ; Liška, Pavel (referee) ; Nečasová, Barbora (advisor)
The subject of my bachelor thesis are selected chapters of the construction-technological project of the substructure of a storage hall together with the retaining walls including the main landscaping. The construction is a newly built storage hall with administratively technical and social built-in structure. The built-in has two aboveground floors. It is situated in Lhota za Červeným Kostelcem in Královéhradecký region. The bachelor thesis deals with the realization of the ground works, partially of the foundations and the retaining walls and their technology, realization, costly justify and time consuming. The part of the project is the Concomitant and Summary technical report focusing for selected stages and follow up to technological regulations, solutions of the construction site equipment, a draft of a mechanical assembly, a timetable, an itemized budget including bill of quantities, the inspection and test plan and a safety and a health protection at work.
The decision on the introduction of external scoring model based on a comparison to the current internal solution
Hrubá, Elina ; Bína, Vladislav (advisor) ; Světlík, Jiří (referee)
In my thesis I have analyzed internal and external scoring model of financial organization. I have prepared comprehensive comparison and evaluation of both internal and external scoring systems. The aim of the thesis was creating a complete assessment of external scoring system with the simplified financial analysis and also with taking into the consideration appropriateness of this offer before approving purchase of external model.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.