National Repository of Grey Literature 36 records found  beginprevious17 - 26next  jump to record: Search took 0.01 seconds. 
Speed Increasing for Track Section Čejč - Hodonín
Látal, Jan ; Komárek, Jan (referee) ; Svoboda, Richard (advisor)
This bachelor´s thesis will examine the possibility of increasing the line speed in the track section Čejč - Hodonín. The proposed rate increase will be considered in two variants, the first version based on the retention of geometrical parameters of the current track, the second option will involve changes of the track geometry parameters. These changes, however, may not cause significant interference with the body lines. Both cases must also be seen in the speed limit in areas of railway crossings, railway branching, position lights, etc., or its possible proposed the change of this objects.
Study of the Zajeci Railway Station Reconstruction
Nguyen, Trong Tan ; Mojžíšek, Dominik (referee) ; Dušek, Erik (advisor)
The master‘s thesis deals with the design of railway station Zajeci reconstruction . The aim of the thesis is to raise the line speed at the main tracks up to 200 kph and the design of full peronization of the railway station. The thesis also includes the design of railway substructure adjustments and drainage renewal.
Study of Rájec-Jestřebí Railway Station Upgrading
Benáčková, Jana ; Pokorný, Ondřej (referee) ; Svoboda, Richard (advisor)
The diploma thesis focused on study of the reconstruction of the railway station Rájec-Jestřebí. During the reconstruction it is necessary to solve the increase of speed in the main tracks to 160 km/h, full peronization of the station and modification of the railway substructure with drainage.
Moravske Branice - Oslavany Track Speed Increase
Hrdlička, Šimon ; Křemen, Tomáš (referee) ; Říha, Tomáš (advisor)
The bachelor's thesis deals with the increase of a track speed in the section Moravske Branice – Oslavany. The thesis attempts to obtain a speed increase by modifying the existing geometric parameters of the track in the scope of the regular maintenance, in some cases even more thorough, yet still not that costly. The assessment of geometric parameters of the track is done according to the standard CSN 73 6360-1. It is also assessed whether the individual railway crossings meet the conditions for the track speed increase. Part of the thesis is also the design of speed for vehicles with a permitted cant deficiency of 130 mm.
Design of double-tracking study of the track section Chlumec nad Cidlinou - Hradec Králové
Hlávka, Miloslav ; Brůha, Bohuslav (referee) ; Hruzíková, Miroslava (advisor)
Diploma thesis studies a possibility of doubling track between Chlumec nad Cidlinou and Hradec Králové. It proposes some solutions which differ in the lenght of the track section where track speed is increased to 160 kmph. Also, the possibilities of elimination of railway crossings with the roads of any category are examined and overview of costs for construction.
Study of Speed Increasing of Hanušovice - Bludov Track Section
Lehnert, Jan ; Brůha, Bohuslav (referee) ; Hruzíková, Miroslava (advisor)
In this thesis I propose increasing of the speed on the railway line No. 292 on the section žst.Bludov - žst. Hanušovice. It includes is complete design of horizontal and vertical ratios, eventually relocation of the track. Railway substructure is solved in selected sections. The thesis solves also editing of platforms and crossing structures.
Design of Modernization of Slavkov u Brna Railway Station
Řehůřek, Tomáš ; Jagošová, Magdaléna (referee) ; Plášek, Otto (advisor)
This thesis deals with the project of modernization of Slavkov u Brna railway station. The main aim is to draft adjustments of the platforms to fulfil the requirements for the movement of people with reduced mobility. To decide which kind of platform is possible to build. Also to plan the adjustments to track bed and platforms taking into consideration what the customer of railway operation had ordered. To draft reconstruction taking into consideration how old and worn-out permanent way and substructure is, with the posibility to increasing track speed.
Study of Speed Increasing for the Boří les - Hrušovany nad Jevišovkou Track Section
Grenar, Filip ; Vacek, Josef (referee) ; Hruzíková, Miroslava (advisor)
The aim of this work is to study track speed increase in section between Boří les – Hrušovany nad Jevišovkou – line Břeclav – Znojmo. In terms of this work directional and height adjustment is beig suggested. The ambition was to ensure basic accessibility of this area within existing range. The study was prepared and respects costs.
Design of Reconstruction of Brno - Znojmo Track Section
Maršalík, Jakub ; Beňák, Lubomír (referee) ; Svoboda, Richard (advisor)
The aim of the thesis is design posibility for speed increasing and reduce traveling time of the trains between Brno and Znojmo and so demonstrate railway competitive ability. In the thesis is design of reconstruction alignement and vertical profile of railway track including line relocation in some sections for reach traveling time under one hour. The thesis include the assessment of traveling time and investment costs.
Speed increasing for the Havlíčkův Brod - Humpolec railway track
Turoň, Martin ; Maršalík, Jakub (referee) ; Hruzíková, Miroslava (advisor)
The theme of this bachelor´s thesis deals with an increase of the operating speed for the track Havlíčkův Brod – Humpolec. The speed increase is considered for present track geometry parameters which complies with the standard ČSN 73 6360-1. Track geometry parameters changes are designed in places of train speed restrictions and they don’t cause any significant changes in the railway track. Switches and crossings and railway crossings have an influence on the operating speed. The thesis deals with solutions of speed restrictions on the railway crossings.

National Repository of Grey Literature : 36 records found   beginprevious17 - 26next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.