National Repository of Grey Literature 13 records found  previous11 - 13  jump to record: Search took 0.01 seconds. 
Problems in Solder Paste Stencil Printing for Fine Pitch Components
Šimeček, Ondřej ; Polsterová, Helena (referee) ; Starý, Jiří (advisor)
Despote the indisputable advantages of fine-pitch components, is need to calculate with a few trouble during production, especially increased requirements for accuracy of mounting and solder printing. In this work I’m concerned with problems of solder printing for these components and evaluation using SPC. For the evaluation I used 3D paste inspection based on laser scanning of the surface. The output of this work is to describe the principles of solder printing and elaborating of GR&R, SPC analysis and histograms of solder printing for some outputs. I focused in my master thesis on motive design change of problematic components and economic evaluation of the adjustments.
Lean production of electronics
Hála, Antonín ; Vyškov, Jiří Pospíšil, VELUX (referee) ; Špinka, Jiří (advisor)
Aim of diploma thesis “Lean production of electronics” is to apply lean production on workplaces in concrete company. Object of thesis is to orientate in lean production and apply its individual methods on workplace. First part of thesis is dealing with theoretical preparation, understanding lean production and methods of lean production. Second part is dealing with analyzing production processes, application of methods of lean production and designing workplaces.
Optimisation of the selected manufacturing process in the company Car manufacturing.
Šmídová, Pavla ; Svobodová, Hana (advisor) ; Rosa, Alexandr (referee)
This thesis deals with the optimisation of the selected manufacturing process. The aim is to analyse the effectiveness of the selected welding and assembly lines. Another objective is to do a detailed analysis for the line with the lowest efficiency in terms of cycle time and the Overall Equipment Effectiveness and calculate the lost production time due to availability, performance and defects. The third objective is to identify possible measures leading to higher utilization of manufacturing line and to propose a possible implementation. The theoretical part is based on the literature examining the term standardization, the norms of labour intensity, the cycle time, the Total Productive Maintenance and the calculation of the Overall Equipment Effectiveness. In the practical part the profile of Car manufacturing is being presented, the analysis of secondary data to calculate the Overall Equipment Effectiveness is being done and the appropriate manufacturing line for the innovative plan is being selected. Furthermore, the analysis of secondary data regarding the effectiveness of the using time of the manufacturing line is being done, the calculation of the Overall Equipment Effectiveness and the collection of primary data is being carried out. Subsequently, the problematic spots of the manufacturing line are being found and the possible measures leading to higher efficiency of manufacturing line are being proposed.

National Repository of Grey Literature : 13 records found   previous11 - 13  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.