| |
|
Technical manual - neosted SOT test bench
Steiger, Lukáš
The purpose of this document is to provide basic set of rules and instructions that allows using and maintaining of the NEOSTED SOT test bench (BB).\nFurther detailed informations and proper references about individual parts of the BB system can be found in [AD-2, AD-3].
|
|
Test procedure - neosted SOT test bench
Pleštil, Jan ; Steiger, Lukáš ; Václavík, Jan ; Veselý, Martin
This document describes the final design of the NEOSTED SOT Test Bench, i.e. its individual components, and serves as a groundwork for the acceptance test procedure.\nThe test to be performed according to this procedure are to demonstrate the compliance of the above item to the requirements specified in the applicable document [1] as part of the overall verification program. The test results shall be collected in a Test Report.
|
|
Technical manual - collimator
Kredba, Jan ; Steiger, Lukáš ; Tomka, David ; Václavík, Jan
The purpose of this document is to provide basic set of rules and instructions that allows using and maintaining of the NEOSTED collimator (COL).\nBe aware that it is not purpose of this document to provide detailed description of individual parts of the COL system. If necessary all the details and proper references can be found in [AD-2].
|
|
Transport and package manual - collimator
Steiger, Lukáš ; Václavík, Jan
The purpose of this document is to provide basic set of instructions and recommendations that allows careful transportation of the NEOSTED collimator (COL).\nBe aware that it is not purpose of this document to provide detailed description of individual parts of the COL system. If necessary all the details and proper references can be found in [AD-2]
|
|
Collimator - test readiness review
Budasz, Jiří ; Kaván, František ; Kredba, Jan ; Lédl, Vít ; Mach, Marek ; Pleštil, Jan ; Psota, Pavel ; Steiger, Lukáš ; Tomka, David ; Václavík, Jan ; Veselý, Martin
This document describes the test procedure applicable to the overall functional test of the NEOSTED collimator.\nThe test to be performed according to this procedure are to demonstrate the compliance of the above item to the requirements specified in the applicable document as part of the overall verification program. The test results shall be collected in a Test Report.
|
| |
| |
| |
| |