National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Prestressed girder bridge
Páteček, Tomáš ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
The thesis deals with the design of a new bridge construction at the place of an existing bridge on the road II/39 between the villages of Dobrkovice and Kájov over the river Polečnice. Three studies were developed as a solution. The chosen variant contains the construction of a prestressed girder bridge, simply supported, with a length of bridging 27,464 m. The category of the transferred road is S9,5, a body of transferred road is on both sides of the bridge in the embankment.
Bridge on a ramp
Páteček, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The object of this diploma thesis is the design and review of a bridge on a ramp. The bridge is part of a junction between the expressway R35 and the highway D1. Three case studies were made. The bridge construction is solved as continuous beam with six spans. The resulting design was made of prestressed concrete according to valid standards. The gradual construction was taken into consideration.
Bridge on a ramp
Páteček, Tomáš ; Pachl, Radek (referee) ; Panáček, Josef (advisor)
The object of this diploma thesis is the design and review of a bridge on a ramp. The bridge is part of a junction between the expressway R35 and the highway D1. Three case studies were made. The bridge construction is solved as continuous beam with six spans. The resulting design was made of prestressed concrete according to valid standards. The gradual construction was taken into consideration.
Prestressed girder bridge
Páteček, Tomáš ; Klusáček, Ladislav (referee) ; Panáček, Josef (advisor)
The thesis deals with the design of a new bridge construction at the place of an existing bridge on the road II/39 between the villages of Dobrkovice and Kájov over the river Polečnice. Three studies were developed as a solution. The chosen variant contains the construction of a prestressed girder bridge, simply supported, with a length of bridging 27,464 m. The category of the transferred road is S9,5, a body of transferred road is on both sides of the bridge in the embankment.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.