National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Administrative center Hodonin - building and technological project
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
Mounting frame structures of production and warehouse complex in Paskov
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the submitted thesis is the implementation of a reinforced concrete skeleton assembled in Paskov. This is a manufacturing and warehouse facility Italinox. The work contains a comprehensive technical report, technical report transport relations, bills of quantities, two technological regulations, two control and test plans, design of mechanical assemblies, and health and safety. The appendix contains drawings framed construction and piloting, budget, schedule, drawing of the site.
Administrative center Hodonin - building and technological project
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
Mounting frame structures of production and warehouse complex in Paskov
Gaďurek, Robin ; Nečasová, Barbora (referee) ; Vlčková, Jitka Laura (advisor)
The content of the submitted thesis is the implementation of a reinforced concrete skeleton assembled in Paskov. This is a manufacturing and warehouse facility Italinox. The work contains a comprehensive technical report, technical report transport relations, bills of quantities, two technological regulations, two control and test plans, design of mechanical assemblies, and health and safety. The appendix contains drawings framed construction and piloting, budget, schedule, drawing of the site.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.