The analysis of parallel operation variants of supply areas 110 kV Čebín and Sokolnice
Reiter, Martin ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
The diploma thesis is focused on the analysis of parallel operation of Čebín and Sokolnice substations. Different variants of parallel operation are researched. A calculation of steady state by the iterative method is described in the theoretical part. The next part briefly mentions a short-circuit and dimensioning of conductors. The possibility of overloading of lines and transformers is discussed in the last chapter of the theoretical part. The current state of the situation is described in the practical part. Main goal of the practical part of the diploma thesis is to design a configuration capable to parallel operation. Also another configuration of supply of this area is designed. There must be no direct connection between Čebín and Sokolnice substations on 110kV level in this configuration. This configuration should eliminate a transit flow of power. Each configuration has to fulfill the requirements on the steady state and on short-circuit current capability. One of the last chapters is focused on the steps, that should by undertaken to prevent transit flow of power.
The analysis of parallel operation variants of supply areas 110 kV Čebín and Sokolnice
Reiter, Martin ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
The diploma thesis is focused on the analysis of parallel operation of Čebín and Sokolnice substations. Different variants of parallel operation are researched. A calculation of steady state by the iterative method is described in the theoretical part. The next part briefly mentions a short-circuit and dimensioning of conductors. The possibility of overloading of lines and transformers is discussed in the last chapter of the theoretical part. The current state of the situation is described in the practical part. Main goal of the practical part of the diploma thesis is to design a configuration capable to parallel operation. Also another configuration of supply of this area is designed. There must be no direct connection between Čebín and Sokolnice substations on 110kV level in this configuration. This configuration should eliminate a transit flow of power. Each configuration has to fulfill the requirements on the steady state and on short-circuit current capability. One of the last chapters is focused on the steps, that should by undertaken to prevent transit flow of power.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.