National Repository of Grey Literature 3 records found  Search took 0.02 seconds. 
D1 Reconstruction of Bridge on Motorway D1-212 in Ostrovačice, Preparation and Realization of Structure
Kratochvíl, Tomáš ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main building machines, the SO 201 time schedule, a desigh of the bill of quantities for structure, technical note for superstructure of a bridge and control and test plans. Part of the preparation of the building is the processing of the emergency plan.
Railway Station Jihlava-Pavov HSR
Provázek, Miloš ; Janoušek, Jan (referee) ; Říha, Tomáš (advisor)
The objective of the diploma thesis is to the design of a transfer terminal on the VRT RS1 high-speed line in Jihlava-Pávov location at the crossing point with the existing railway line Havlíčkův Brod - Jihlava. The thesis deals with the integration of the transfer terminal into the existing transport infrastructure with an emphasis on the quality of its own transport service. The work includes the design of transport structures at the preliminary design level.
D1 Reconstruction of Bridge on Motorway D1-212 in Ostrovačice, Preparation and Realization of Structure
Kratochvíl, Tomáš ; Kratochvílová, Erika (referee) ; Šlanhof, Jiří (advisor)
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main building machines, the SO 201 time schedule, a desigh of the bill of quantities for structure, technical note for superstructure of a bridge and control and test plans. Part of the preparation of the building is the processing of the emergency plan.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.